Concrete Formwork for pouring shear wall and column
High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens.
Advantages: 1. Can create any shape and size of wall formwork with any thickness.
2. Can choose whichever form face material best meets your requirements - e. G. For smooth fair-faced concrete.
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials.
4. Can be pre-assembled on your site or before arrival at your site, saving time, cost and space for you.
5. Can match well with most Euro formwork systems.
Wall Formwork Components: Components | Diagram / photo | Specification / description |
Wall formwork panel |
| For all vertical formworks |
H20 Timber beam |
| Water proof treated Height: 200mm Width: 80mm Length: As per table size |
Steel waling |
| Painted, powder coated [12 steel channel |
Flange clamp |
| Galvanized To connect steel waling and H20 beams |
Panel strut |
| Painted |
Waling connector 80 |
| Painted Used for formwork panels alignment |
Corner connector 60X60 |
| Painted Used for forming inner corner formwork with wedge pins |
Top scaffold bracket |
| Painted, Severs as safety working platform |
Packing: 1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: Timber beam, steel props, tie rod, etc.
---pallet: Small parts will be put in bags and then on pallets.
---wooden cases: It is available on customer's request.
---bulk: Some irregular goods will be loaded in bulk in container.
Delivery: 1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.