SS304 Pump Casting

China SS304 Pump Casting, Find details about China Lost Wax Casting, Machinery Part from SS304 Pump Casting

Model NO.
casting64
Surface Roughness
Ra0.4
Machining Tolerance
+/-0.01mm
Standard
AISI
Certification
CE, RoHS, ISO 9001:2008
Casting
Investment Casting
Weight
0.3kg-100kg
Machining Service
Available
Stainless Steel Casting
Silica Sol Casting
Trademark
Ablinox
Transport Package
Cartons
Specification
CE, ROHS, SGS
Origin
Guangdong, China
HS Code
7325999000
Model NO.
casting64
Surface Roughness
Ra0.4
Machining Tolerance
+/-0.01mm
Standard
AISI
Certification
CE, RoHS, ISO 9001:2008
Casting
Investment Casting
Weight
0.3kg-100kg
Machining Service
Available
Stainless Steel Casting
Silica Sol Casting
Trademark
Ablinox
Transport Package
Cartons
Specification
CE, ROHS, SGS
Origin
Guangdong, China
HS Code
7325999000

Product Description

SPECIFICATION
Name:Investment Casting Parts
Material :Stainless steel, Carbon Steel
ProcessLost wax casting
Standard GBT 6414-1999
Casting ToleranceCT6 Standard
Weight0.1kg to 100kg
Product rangeAutomotive, aviation, robot automation, machinery, tools, hardware, electronics, sanitary ware,pump valves, door locks and other stainless steel, carbon steel, alloy steel parts
Delivery time:15-30days after receipt of advance payment on the basis of quantity
Payment term:30% deposit,  70% balance before delivery
Service Project plan, installation guide, after-sale service , forwarder service

SS304 Pump Casting
 
material components

Chemical Composition of Material
Material


Composition
201202304316430
C≤0.15≤0.15≤0.08≤0.035≤0.12
Si≤1.00≤1.00≤1.00≤1.00≤1.00
Mn5.5-7.57.5-10≤2.00≤2.00≤1.00
P≤0.06≤0.06≤0.045≤0.045≤0.040
S≤0.03≤0.03≤0.030≤0.030≤0.030
Cr13-1514-1718-2016-1816-18
Ni0.7-1.13.5-4.58-1010-12 
Mo   2.0-3.0 

Mechanical Property
Material Item201202304316
Tensile Strength≥535≥520≥520≥520
Yield Strength≥245≥205≥205≥205
Extension≥30%≥30%≥35%≥35%
Hardness (HV)<105<100<90<90


Advantange
1.With our own stainless steel investment casting production lines and machining lines, give you one stop services.
2.With CNC(CNC CENTER),we make the tooling by ourselves.Make you easiler.
3.With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
4.Use Germany Spectrometer and Salty Spray to test the raw material.
5.We have 15 engineers with strong ability in design and develop new products.
6.With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
7.With ERP system,We can give you the production and delivery information at the first time. Also if any quality problem,We can source it and give you the solution very fast.
8.Fast reply within 12 hours.


Company Introduction

ABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on the Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve the higher sales goal.

SS304 Pump Casting


Production Process
StepsTime
Tooling MakingCNC Center7 days


Casting Process
Wax Injection2 days
Sand Shell Molding5 days
Dewaxing1 days
Pouring1 days
Cutting1 days
Grinding1 days
Cleaning1 days


Machining Process
CNC2 days
Drilling & Tapping2 days
Welding2 days
Stamping1 days
Polishing5 days

Assembling
Ultrasonic Washing1 days 
Water Testing1 days
Assembling2 days
Remark: The production time base on standard quantity and process


SS304 Pump Casting


Our mission
To change the world's view about Chinese product.
To be the leader in precision casting industry

Our dream
To gain Win-win achievement with all of our clients and supplies
To be an international famous brand.
To be a one-hundred-year company
SS304 Pump Casting
After-sales Service
Reply you fast within 12 hours.
Have someone to follow up all your inquiry and order.
We will offer satisfied quality and prices to you.