China Morden Garden Furniture Set Outdoor Rattan Dining Set Hotel Table Chair Sets, Find details about China Outdoor Chair, Outdoor Furniture from Morden Garden Furniture Set Outdoor Rattan Dining Set Hotel Table Chair Sets
1.Frame:High quality steel frame with powder-coated.
2.Cushion:100% polyester, water-resistant cushion.
Loading:
Workshop:
Inquiry to us:
Email us your requests, we will offer you in 24 hours.
Negotiation:
Prices, payment way, delivery time, shipping, etc… we will sign a contract.
Pay deposit:
After buyer arrange down payment or issuing B/L at sight to us, we will arrange production at soonest.
Production complete:
We will inform you before one week time of production complete.
Take photos& inspection:
We will inspection & take photos and send to you for reference 2 days before shipping.
Send documents:
We will send you origin B/L and custom documents (packing list, commercial invoice etc) by express. Or Telex Released B/L.
Satisfy & repeat orders:
We thank you for your great support, and look forwarder to building long-term cooperation with you.
Factory Information:
We located in Zhejiang, Welcome to visit us anytime.
Factory Size | 30000 Square meter | Factory Location | Linhai, Zhejiang Province,China |
R&D Staff | 21-30 | QC Staff | 6-10 |
Contract Manufacturing | OEM service offered design service offered buyer label offered | Main Market | Europe,North America,South America,Asia |
Export Percentage | 85%-95% | Total Annual Sales Volume | USD3 Million to USD 5 Million |
Fair show:
1)SPOGA in Germany
2)CIFF in Shanghai & Gangzhou
3)Canton Fair in Guangzhou
1. What is your MOQ?
MOQ is 1*40 GP container.
1*40GP container with no more than 2 items.
2. Do you aceept sample order?
We accept sample order. However customer has to pay for the product cost and shipping cost.
3. Can I customize outdoor furniture from you?
Yes, can change the Dimension according to your needs.
4. Do you have own factory?
Yes, we are manufacturer with own factory and moulds and production lines, engaged in outdoor furniture for more than 11 years.
5. How about your Lead time?
Our production process needs 15-35 days depends on the product's design and when will you place the order.
6. What about the payment term?
a.20~ 30%deposit T/T paid before production,the balance againset copy of B/L or L/C at sight
b. L/C at sight.