UL Standard EMT Pipes Electrical Steel Tubes

China UL Standard EMT Pipes Electrical Steel Tubes, Find details about China EMT, EMT Pipes from UL Standard EMT Pipes Electrical Steel Tubes

Finish
Pre-Galvanized
Outside Diameterr
17.93-114.3mm
Wall Thickness
1.07-2.11mm
Length
3050mm
Trademark
TUNZEL
Transport Package
Standard Seaworthy Packing
Specification
1/2",3/4",1",1-1/4",1-1/2",2",2-1/2",3",3-1/2",4"
Origin
Zhejiang, China
HS Code
7306309000
Finish
Pre-Galvanized
Outside Diameterr
17.93-114.3mm
Wall Thickness
1.07-2.11mm
Length
3050mm
Trademark
TUNZEL
Transport Package
Standard Seaworthy Packing
Specification
1/2",3/4",1",1-1/4",1-1/2",2",2-1/2",3",3-1/2",4"
Origin
Zhejiang, China
HS Code
7306309000
EMT Pipes Electrical Steel Sonduit
 Product Description
UL Standard EMT Pipes Electrical Steel Tubes
Product NameEMT pipes
MaterialSteel
FinishPre-Galvanized
Trade Size1/2"-4"
ApplicationStructure Pipe Through Electrical Wiring
CertificateUL
PackageBundles
Shipping termBy Sea

 Specification
Size  Outside DiameterInside Diameter  Wall Thickness  Length  
inchinchmmInchmm(1)mm(2)mmfeetmm
1/2" 0.706 17.93  0.622 15.80 1.07 0.85 10 3050 
3/4" 0.92223.42 0.824 20.93 1.25 0.95 103050
 1"1.16329.54  1.049 26.64 1.45 1.10 10 3050 
 1-1/4"1.51038.35 1.380 35.05 1.65 1.30 10 3050 
 1-1/2"1.740 44.20 1.610  40.89  1.65 1.30 10 3050 
 2" 2.197 55.80 2.067  52.50  1.65  1.40  10 3050 
 2-1/2" 2.875 73.03  2.731  69.37 1.83 - 103050
 3"  3.500  88.90 3.356 85.24 1.83 - 103050
 3-1/2" 4.000101.60  3.834 97.38 2.11 - 10 3050 
 4"  4.500 114.30 4.334 110.08 2.11 - 10 3050
 Production Process
 UL Standard EMT Pipes Electrical Steel TubesUL Standard EMT Pipes Electrical Steel TubesUL Standard EMT Pipes Electrical Steel TubesUL Standard EMT Pipes Electrical Steel Tubes
 FAQ

 Q1:When can I get the quotation?
 A1:Within 24 hours.

 Q2:Which port do you refer?
 A2:Shanghai port or Ningbo port.

 Q3:What's your Minimum Order Quantity(MOQ)of your product?
 A3:Generally,MOQ is 1x20' container.Others can contact us directly.

 Q4:How about the lead time?
 A4:Usually 20 days after deposit in our account.
If you have any questions,please feel free to contact us!!