China Pickling and Phosphating 150-500kg Xinke Protective Film Carton Metal Shelving Adjustable Rack, Find details about China Storage Shelf, Metal Shelves from Pickling and Phosphating 150-500kg Xinke Protective Film Carton Metal Shelving Adjustable Rack
Name | Description |
Guarantee period | 5years |
Material | Cold-rolled steel |
Height | 2 m |
Width | 1m, 1.2m, 1.5m, 2m |
Length | 40cm, 50cm, 60cm |
Thickness | 0.7-1.3mm |
Load Capacity | 100-500 kgs per layer |
Layers | 2-5 adjustable layers |
Color | Blue, White, Gray, or customizable |
Surface | Pickling and Phosphating, Electrostatic spraying |
Characteristics | Anti-rust, Corrosion-protection |
Name | Specification |
Warehouse Rack | 1000mm* 500*mm* 2000mm, Load Capacity: 100kgs/layer, 4 layers |
Warehouse Rack | 1200mm* 500mm* 2000mm, Load Capacity: 100-300kgs/layer, 4 layers |
Warehouse Rack | 1500mm* 500mm* 2000mm, Load Capacity: 100-500kgs/layer, 4 layers |
Warehouse Rack | 2000mm* 500mm* 2000mm, Load Capacity: 100-500kgs/layer, 4 layers |
Kitchen Rack | 600mm* 300mm* 1200mm, 4 layers |
Kitchen Rack | 700mm* 400mm* 1200mm, 4 layers |
Kitchen Rack | 800mm* 400mm* 1200mm, 4 layers |
Kitchen Rack | 900mm* 500mm* 1500mm, 4 layers |
1. How about your delivery time?
A: Generally, it will take 10 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
2. How can I install the shelf and rack?
A: It's easy to install the shelf because our shelf design is without any screws and nuts. There are also install videos and pictures for you.
3. What is the MOQ can order be?
A: Normally is one 20 ft container. It also depends on the size of your products.
4.What are the main rack and add-on rack?
A: The difference between the two racks is upright. The main rack is the start rack with 2 uprights and the deputy rack is the
continue rack with 1 upright only. For example, if there are 10wall racks, the overall structure will be 1 main rack+ 9 deputy racks.