China Pre-G 240mm Steel Plank Ring Lock/Ringlock/Cup Lock Scaffold Plank for Scaffolding/System Scaffolding Formwork, Find details about China Scaffold, Scaffolding System from Pre-G 240mm Steel Plank Ring Lock/Ringlock/Cup Lock Scaffold Plank for Scaffolding/System Scaffolding Formwork
Steel Plank is designed to span the bay by hooking to the horizontal/Ledger of the bay. It provides a safe working platform to the workers.
The use of steel scaffold plank avoids the disadvantage of heavy water absorption and extreme slippery caused by rain on wooden scaffold planks. It is light weight and high strength, easy to install and highly reusable. It fits multiple styles of system scaffolding (Ring Lock, Cup Lock etc).
MATERIAL: Q235 Steel
STANDARD FINISHING: PRE Galvanization (Pre-G)
STEEL PLANK
Product Code | Description | Width | Length | Weight | ||
Metric (mm) | Metric (mm) | Imperial (lbs) | Metric (kgs) | |||
SP088 | Steel Plank 0.88M | 240 | 880 | 14.41 | 6.55 | |
SP091 | Steel Plank 0.91M | 240 | 910 | 14.85 | 6.75 | |
SP106 | Steel Plank 1.065M | 240 | 1065 | 16.81 | 7.64 | |
SP115 | Steel Plank 1.15 M | 240 | 1150 | 18.35 | 8.34 | |
SP121 | Steel Plank 1.21M | 240 | 1121.9 | 10 | 8.64 | |
SP152 | Steel Plank 1.52M | 240 | 1524 | 22.5 | 10.23 | |
SP157 | Steel Plank 1.57M | 240 | 1570 | 23.14 | 10.52 | |
SP182 | Steel Plank 1.82M | 240 | 1820 | 25.43 | 11.56 | |
SP213 | Steel Plank 2.13M | 240 | 2130 | 31.84 | 14.47 | |
SP243 | Steel Plank 2.43M | 240 | 2430 | 34.43 | 15.65 | |
SP305 | Steel Plank 3.05M | 240 | 3050 | 43.90 | 19.95 |
WUXI JTX METAL CO.,LTD is a specialized manufacturer working on producing various scaffoldings. We have established more than 8 years and have long-term cooperation with customers from North America, East Asia, Oceania etc.
Our factory provides high quality scaffoldings and professional technical support to ensure you can get perfect items and easy to use them.
We have standard system scaffoldings, frame scaffoldings and accessories can be chosen, or you can get them by custom-made.
Q: Are you a trading company or factory?
A: We are a factory.
Q:Where is your factory and the normal loading port?
A:Jiangsu
And the loading port usually will be SHANGHAI PORT
Q:How long will be taken to produce after ordering?
A: About 35 days.
Q:Can I get some samples?
A: YES. The sample will be free but you may bear the cost of delivery.
Q:What is your payment term?
A:30% T/T in advance, balance before shipment.