STEEL FRAME HANGAR
Benefits
Using a combination of metal construction and pre-fabricated components provides three main advantages:
Cost.
Because erection labor is drastically reduced, you can save as much as 30% or more over more traditional construction methods.
Speed.
Because many of the components are pre-fabricated at our plant, construction time is greatly reduced.
Durability.
Steel building components are guaranteed to last 20 to 30 years without repainting or other maintenance.
1.Steel Structure Information:
Type | construction building |
Wide span | single span or multiple spans, the max span clear distance is 36m, without middle column |
Roof and Wall | option: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel |
Door and Window | PVC or Aluminum alloy; sliding door or rolled door |
Column and Beam | Option: hot rolled or welded H section, I section; painting or galvanized |
Purlin | Option: C-section or Z-section |
Local Climate | 1. Wind speed 2. Snow load 3. Rain quantity 4. Earthquake grade if have More details is preferred. |
Crane Parameter | If need crane beam, crane tons parameter and lift height are needed |
Drawing | 1. according to clients' drawing |
2. design as per clients' dimension and requests |
Package | Naked loaded in shipping container or as per requests. |
Loading | 20 GP, 40HP, 40 GP, 40 OT |
2.Our Technical Advantages:
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement. |
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service. |
C. One stop shopping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part. |
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection. |
E.We have pretty good preservative treatment on this steel frame as follows, 1. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.
2. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions. |
3.Oversea Projects List:
1. Benz workshop ( 26000sqm) 2. The shanghai world expo German museum
3.Shen yang North Railway station 4.Coca-Cola (China)Beverages Co.,Ltd
5.Institute of Nuclear Tsinghua University. 6. Brazil power plant
7.Sichuan earthquake prefabricated house 2000units for free 8.Oman gymnasium
9.Residential for Low-income families in Angola 10.Supermarket for Belarus.
11.Austrialia XX engineering workshop. 12. Racks warehouse for Ukraine.
13. Residential buildings of Venezuela. 14. 180 units prefabricated house for Chile
15. 20000 m PU sandwich panels for Brazil 16. 110000 m PU sandwich panels for America.
17. 400 units prefabricated house for Spain 18. 200 units prefabricated house for UN in Sudan
19.Indian workshop for mineral company:27800sqm 20.Malaysian student apartment53000 sqm
4.Features:
1. Item Name: steel structure warehouse/ workshop
2. Steel Material: Q235 and Q345.
3. Connection Type: bolted connection.
4. Preservative Treatment: painted
5. Advantages: fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.
Steel structure workshop included the main structure( steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar, etc), door and windows, and other accessories.
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement.
B. Its very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
C. We have pretty good preservative treatment on this steel frame as follows,
a. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.
b. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.
D. You can choose freely the roof and wall panel, included both types:
a. Heat-Insulating material( EPS, Glass wool, Rockwool, PU, etc.)
they have different thickness(50mm,75mm,100mm, 200mm), density, color, type, etc.
b. Single color corrugated steel sheet( Steel Material: Aluminum- Zinc sheet):
They have different thickness( 0.3-0.7mm), color, type, etc.
E. You can choose freely the material of door and windows
F. We also have so many accessories, for example, steel bracket, bolts, self-drilling screw, rivet, inter and outer cullis, rainspout, trimming sheet, glass cement, etc. you can buy them according to your exact requirement
Warmly welcome to visit our company!