Modern Villa House Prefabricated House Villa

China Modern Villa House Prefabricated House Villa, Find details about China Steel Structure Warehouse, Steel Frame from Modern Villa House Prefabricated House Villa

Model NO.
QDSM-196
Surface Treatmen
Galvalume, Az275
Tolerance
+-2mm
Material Grade
G550/G350
Insulation
Polyurethane, Rockwool, Glasswool, EPS
Accessories
Aluminum Window, Thermal Broken Door
Wind Load
285 Km/Hour 180 Miles/Hour
Snow Load
Max. 200 Kg/Sqm
Earthquake Scale
Ritcher 8
Trademark
QDSM
Transport Package
Bundled by Steel Belt / Pallet
Specification
Customized
Origin
China
HS Code
73089000
Model NO.
QDSM-196
Surface Treatmen
Galvalume, Az275
Tolerance
+-2mm
Material Grade
G550/G350
Insulation
Polyurethane, Rockwool, Glasswool, EPS
Accessories
Aluminum Window, Thermal Broken Door
Wind Load
285 Km/Hour 180 Miles/Hour
Snow Load
Max. 200 Kg/Sqm
Earthquake Scale
Ritcher 8
Trademark
QDSM
Transport Package
Bundled by Steel Belt / Pallet
Specification
Customized
Origin
China
HS Code
73089000
modern villa house prefabricated house villa 
Product Description

 
Main frame
C90/C140 prefabricated light weight steel structure. 0.8mm-1.2mm thick G550 or G350, AZ275g/SQM
Exterior wall
Exterior wall panels Pattern thermal broken panel or aluminum panel 
Breathing paper
OSB board
Light steel structure with fiber glass wool
Interior wall
Dry area: OSB board, gypsum board
Bathroom: MGO or cement board
Roof
Asphalt shingle/Metal sheet
Double SBS waterproof material
OSB board/MGO Board with Thermal insulation glasswool 
Downpipe (optional)
Ceiling
Dry area: gypsum board
Bathroom : MGO/PVC ceiling panel
            Floor Dry area: Wood Floor or Ceramic tile
Bathroom: Waterproofing SBS material with Ceramic tile
Doors and windows
Aluminum alloy door, aluminum alloy sliding window

Advantages

1.Earthquake resistance: It can withstand 9 rare earthquakes and is suitable for areas with seismic intensity above 8
2.Wind resistance: resistant to 70m/s hurricane, Max. 280km/H
3.Durability: The main structure can last for more than 50 years
4.Fire resistance: refractory time of up to 1~4 hours according to different designs
5.Sound insulation: the sound insulation of the external wall can reach 75dB, and the inner wall can reach 55dB.
6.Heat Insulation: The thermal resistance of 200mm thick composite wall can reach 3.2m2K/W, which is 11 times that of traditional buildings of the same thickness.

7.Environmental protection: more than 90% of steel structure materials can be recycled, and most other supporting materials can be recycled.

8.Energy-saving: using new materials for heat preservation and heat insulation, the energy required for heating and cooling is 65% more energy-efficient than traditional buildings.
9.Housing rate: Light steel integrated housing increases the practical area by about 12% compared with traditional buildings
10Construction period: assembly and standardization of light steel structure houses is simple and fast, saving 2/3 construction period compared with traditional structure

 

Modern Villa House Prefabricated House Villa

Design capability

By using Auto CAD, PKPM,3DMAX,SAP2000,Tekla,etc. We can design different houses according to customes requirement.

 


 

Product Parameters
Modern Villa House Prefabricated House Villa
Modern Villa House Prefabricated House Villa
Modern Villa House Prefabricated House Villa


1. OSB board is a kind of oriented structural board supported by a specific molding process using small diameter timber, thinned wood and wood core as raw materials. Export Grade OSB board for house, and the formaldehyde emission is lower than the European standard E1. Thickness 12/16/18mm as request. 

2. Thermal Insulation fiberglass mineral material

a. Class A1 non-combustible material
b. No odor, environmentally friendly and non-toxic
c. Thermal conductivity ≤0.03W/cm.k
d. heat resistance ≥700 degrees
e. Porous structure, good recovery, not afraid of any shock

3. Cold Form C profile
Light weight, easy for installation, Best Antirusting material as Grade G550, Galvalume treatment, AZ275gram/SQM, Thickness 1.0mm long term durability. Warranty min. 50 years. 

 

Factory Overview

Factory Established in 2008 

Company Area more than 40,000 SQM 

Workshop More than 25,000 SQM 

Production Line:

2 Sets CNC Flame Cutting Machines 

5 Lines for builtup H profiles 

3 Lines for C Girt or Z purlins

3 Lines for Corrugated Wall or Roof Metal Sheet 

3 Lines for Sandwich Panel Sheet---Wall, Roof, EPS, Glasswool, Rockwool, XPS, etc

1 Set Shot Blasting Machine for Painting Pretreatment. 
Modern Villa House Prefabricated House Villa

Quality Control

1. QC processing:

1. Every 3 months meeting for Quality Audit to solve the weakness during processing and procedures

2. Every 6 months meeting for employee training.

3. Producing as to the International Steel Structure Standard with ISO 9001 Quality Control System and European CE Standard both. 

4. Each project, every 6 months, connecting with clients for feedback and complaints, then improve the quality control actions. 

5. Quality inspection report for every process during production. Ensure 100% good quality products. 


2. Company Certificates:
Modern Villa House Prefabricated House Villa

Guide Installation Processing

Modern Villa House Prefabricated House Villa

 

Packaging & Shipping

 

 Modern Villa House Prefabricated House Villa

After Sales Service

 We service customers more than 40 countries all over the world. We establish good business relationship with clients in Poland, Luxemburg, France, Germany, UK, Austria, Angola, South Africa, Egypt, Reunion Island, Maurituis, UAE, Dubai, Russia, India, Singapore, Thailand, Australia, New Zealand, Indonesia, Phillipines, Fiji, Sri Lanka, Mexico, USA, Canada, St. Lucia, Trinidada and Tobago, ect. 
Modern Villa House Prefabricated House Villa

Our Customers

Modern Villa House Prefabricated House Villa

FAQ:

1.Q: Do you have the Engineer team to design the steel villa for me?
A: Absolutely! We are able to provide you with not only construction scheme , but landscape design! One-stop service is our outstanding superiority with no doubt.

2.Q: What should I provide to build a steel villa?
A: if you have the plan layout, it will be easier for us. 
If not, pls inform the wind speed, snow load, building dimension W X L X H, Rainfall capacity, Earthquake scales, etc. then we will design for you as request. 


3.Q: What is the processing for placing order of villa house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation. As cost agreed, then you arrange the down payment for production, after produced ready, we arrange the delivery, then you pay the balance, after that, we will send the guide installation drawings to you help for erection the house. 

4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time

5.Q: Is it difficult to build a steel villa ?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

6.Q: Does this kind of house can only be used in residential building?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, office, school, entertainment club, light industrial workshop, ect.

7.Q: Is steel villa stable?
A: Set your hearts at rest! You are completely safe living in light steel prefab house even if there are hurricanes of 200km/h and 9-grade earthquake outside.

8.Q: what are the advantages of steel villa comparing to the traditional building?
A: Better isolation of sound and heat,Better fireproof and anti-seismic,Wind resistance,Time and labor saving,More usable area,Excellent termite-proof capability

9.Q: Does steel villa look different from the ordinary one?
A: Yes. prefab house is more beautiful and choices for any style .

Q10:How do we cooperate on certain project?
A: Discuss the parameter factors---> Drawings for your project ---> Revised drawings ---> Down payment for production------> loading and delivery----> balance payment-------> Guide installation drawings prepare by us-----> finish installation at project site. 

Q11:What is the delivery time?
Delivery time depends on order quantities. Generally, the delivery time will be 25-30 days after receiving deposit.