Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine

China Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine, Find details about China HDD machine, drilling rig from Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine

Model NO.
GD3500-LS
Type
Track
Engine Power
2*264 kW
Max Torque
367000 N·m
Max Mud Pump Flow
Extra Mud Pump
Trademark
Goodeng
Transport Package
Nude Packing
Specification
18610*3400*3600 mm
Origin
China
HS Code
843041
Model NO.
GD3500-LS
Type
Track
Engine Power
2*264 kW
Max Torque
367000 N·m
Max Mud Pump Flow
Extra Mud Pump
Trademark
Goodeng
Transport Package
Nude Packing
Specification
18610*3400*3600 mm
Origin
China
HS Code
843041
Horizontal Directional Drilling Machine 
  
[Main Performance Characteristics]

  
1.Main hydraulic system. High pressure electric control open-circuit system, compared to closed-circuit system, there is no pressure difference loss caused by oil-adding pressure, the system is more energy-saving and environmentally friendly, and rig work ability can be further enhanced.
2. The machine is equipped with two diesel engines, and one can choose one or two engines to work according to different conditions, so energy is saved. If one of the twin engines breaks down, the other one can still be operated normally (with the same force and low speed), which can greatly improve construction safety.
3. Proportional linear stepless regulation is adopted for driving head rotation and push & pull speed.
4. Front and back clamping can be separated, and the clamping floats in the whole process.
5. It is equipped with φ127×9600mm, φ140×9600mm or φ168×9600mm drill pipe. Floating spindle can further protect the drill pipe thread.
6. Floating girder is good for loading, unloading, climbing and transportation, which is convenient for adjusting entry angle, and the power head length can reach 11 meters, which can effectively protect clamps.
7. Wide steel walking track is convenient for loading and unloading directly in position without taking apart.
8. Two seats are in operation cab, spacious and comfortable, and can be lifted, rotated, with open field of vision.
9. Drill pipe bracket in the middle increases the accuracy of drill pipe loading and unloading, which can highly improve working efficiency.
10.Main control valve. The main switch valve is independently designed according to rig construction conditions, with patent protection. The simple and reliable structure can ensure smooth operation. Big drift diameter design is characterized with smaller throttling loss, smaller heating power, more energy saving, compact shape etc. More reasonable power system structure can improve push-pull speed on the condition of not affecting rig torque and push-pull force, hence meeting speed demands in different construction conditions.
11. To enhance the executing mechanism ability, hydraulic system is designed in conformity to large flow and high pressure. Our self-designed inserting control valve group reacts fast and reduces 50% pressure loss in hydraulic system.
12. Self-designed and developed, combined electronic controlling system realizes its adaptive control to different working conditions and different geologic strata, improving 30% efficiency of construction.
13. Liquid crystal man and rig exchange system can monitor rig condition at any time, which can adjust rig work and alarm parameter, making operation simpler and more comfortable.
14. Rational and effective cooling system ensures safety, reliability and efficiency of system, extends motor using lifespan, and avoids motor damages.
15. System is configured with both auto-operation and man-operation. Auto-operation could timely adjust the running parameter according to the strata situation and automatically adjust the rig for rig and drill rod protection.
  

[Main Technical Parameters]
Engine Power2*264 KwMax. Torque125000 N·m
Max. Push & Pull Force3700 kNMax. Clamping Force of Pipe Jaw2540 kN
Max. Working Pressure Set in System35 MpaMax. Unscrewing Force of Pipe Jaw367000 N·m
Max. Mud Flowing Volume2000 L/minRig Dimension(L*W*H)18610*3400*3600 (mm)
Drill Pipe DiameterΦ127mm-Φ140mmRig Weight56000 kg
Max. Length of Drill Pipe 9.6 mMax. Walking Speed2.5 km/h
Driving HeatMax. Rotation Speed95 rpmPermitted Working Temperatue-30°~50°C
Driving Heat Max. Push & Pull Speed45 m/minPermitted Enviroment Humidity> 90%
Main Spindle Floating Distance100 mmDrill Incidence°8°-18°
Mud Pump Channel Diameter3"Max. Mud Pressure20 Mpa
Max. Aperture DiameterΦ2000mm(Soil Depended)Max Crossing Length2000m(Soil Depended)

[Product Photos ]
    
Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine
Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine
Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine

 

[Cases]
  
Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine
Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine

[Company Information]

Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine
Goodeng 350 ton pipeline jacking machine/horizontal directional drilling machine

[Company Profile]

  
"Goodeng Machine", founded in May 2002, is a national high-tech enterprise, which is specialized in research & development, manufacturing, sales and service for trenchless equipment. Our main products are GD/GS series of horizontal directional drilling machine and accessories. As Mechanization Research Branch industrialization base of China Academy of Building Research, Goodeng Machine has independently developed almost 30 models of horizontal directional drilling machine from 5T to 1200T with strong and professional R & D team's support, which has filled in multiple domestic and foreign technical blanks. Many kinds of products have obtained national and provincial progress prize in science and technology of machinery industry. In 2018, "Goodeng Machine" had honor to get the Chinese Well-Known Trademark, which is the only enterprise to acquire in China's trenchless industry.
   

[Competitive Advantage]

  
1. Competitive Price: We work as the leading dealers of various leading China construction machinery factories, and are treated with best dealership prices every year. From numerous comparisons and feedbacks from clients, our price is more competitive than other factories.
2. Quick Response: Our team is consisted of a group of deligent and enterprising people, working 24hrs/day to respond clients'  inquiries and questions all the time. Most problems can be solved within 12 hours.

  
[FAQ]
  
1. What about the warranty time?
    A:12 months after shipment or 2000 working hours,whichever occuts first.
2. What about the delivery time?
    A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
    A:On T/T term, 30% down payment is required in advnce, and 70% balance shall be before shipment, or
        against the copy of original BL for old client.
        On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 

4.What logistics ways we can work for shipment?
    A: We can ship machine by sea and road.