China C Z Automatic Changing CZ Interchangeable Purline Roll Forming Machine, Find details about China CZ Purlin Roll Forming Machine, Automatic C Lip Channel Roll Forming Machine from C Z Automatic Changing CZ Interchangeable Purline Roll Forming Machine
c z automatic changing cz interchangeable purline roll forming machine is widely used in the construction of various industrial plants, villages, warehouses, supermarkets, hotels, exhibition, family construction, shopping malls shutter doors and etc. It has the advantage of beautiful, classical appearance and grace taste.
1.The chart of process flow:
2.Main equipment:
Decoiler | 5T,manual |
Main machine | 16 stations forming rollers,gear drive. |
Hydraulic pump | 18.5kw. |
Control box | Delta PLC and frequency. |
Run out table | Height adjustable |
Tool box | For operate tool and spare parts. |
3.Technical parameters
1)Profile
No. | Item | Description |
1 | Coil width | According to the final profile |
2 | Rolling speed | 0-15m/min |
3 | Rolling thickness | 1.5-3.0mm |
4 | Control system | PLC (Delta) as list in the note |
5 | De-coiler | 5 TON hydraulic de-coiler |
6 | Flatten roller | 7 Rollers, upper us 3 rollers, down is 4 rollers |
7 | Flattene roller material | SAE1045 thermal treatment hardness 48-52 HRC. |
8 | Roller stations | About 16 stations and one correction adjust system |
9 | Roller material | Ccr15, chrome plated surface with hardness 58-62 degree ,CNC |
10 | Shaft diameter | 45# forged steel, φ76mm |
11 | Main motor power | 18.5kw, AC motor |
12 | Hydraulic station power | 5.5kw |
13 | Hydraulic pressure | 16-20Mpa |
14 | Punching and cutting mode | Machine adopts pre-punching and pre-cutting |
15 | Material of cutting | Cr12Mov |
16 | Tolerance | 3m+-1.5mm |
17 | Electric source | 380V, 50HZ,3 phase or according customer request |
18 | Way of driving | By gear box |
Q1. What's your payment terms and delivery time? A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms like L/C are acceptable. After we get down payment, we will arrange production. About 30-45 days for delivery.
Q2. Do you have after-sales support? A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world. Q3. Do you sell only standard machines? A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken? A4: We provide 24 months free warranty and free technical support for the whole life of any machine. If the broken parts can't repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.
Q5. Can you be responsible for transport? A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company? A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour). 2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can meet you.