Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment

China Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment, Find details about China Sewage Treatment Filter, Industrial Sewage Treatment from Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment

Model NO.
TLDM
Capacity
0.5m3/Hour-100m3/Hour
Installation Type
Underground/ Onground
Function
Sewage Recycling
Cod Outlet
Can Be Lessthan 50mg/L
Voltage
380V / 220V
After Be Treated
Discharge/Recycling for Cleaning or Industry
Painting
Epoxy-Coal Tar Pitch
Color
Blue/Green/Customized by Clients
Warranty
1 Year
Power
1.1kw-12.5kw
Place of Origin
Shandong, China
Logo
Customized
Trademark
TIANLANG
Transport Package
Standard Seaworthy Package for STP
Specification
TLDM-0.5
Origin
Shandong, China
HS Code
8421299090
Model NO.
TLDM
Capacity
0.5m3/Hour-100m3/Hour
Installation Type
Underground/ Onground
Function
Sewage Recycling
Cod Outlet
Can Be Lessthan 50mg/L
Voltage
380V / 220V
After Be Treated
Discharge/Recycling for Cleaning or Industry
Painting
Epoxy-Coal Tar Pitch
Color
Blue/Green/Customized by Clients
Warranty
1 Year
Power
1.1kw-12.5kw
Place of Origin
Shandong, China
Logo
Customized
Trademark
TIANLANG
Transport Package
Standard Seaworthy Package for STP
Specification
TLDM-0.5
Origin
Shandong, China
HS Code
8421299090
1. Product introduction

 Intergrated wastewater treatment equipment is an underground plant which adopts the advanced Biological technology and the company's scientific research and engineering practice result, it can effectively remove BOD5,COD and NH3-N. The device is characterized by the stable performance, effective treatment, economical investment, automatic operation, convenience of maintenance and small occupying space. There is no need for construction, neither heating and heat preservation.The surface can be used as green land or square land.It also can be placed on ground based on client's requirement.

    As the most efficient sewage treatment device, it is widely used in treating the sewage in the area of senior hotels, village districts and residential districts, etc. The water after treatment would meet the national emission standards. The water after be treated can be used to irrigation.

Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment

Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment
2. Product application
(1) Hotel, restaurant, sanatorium, hospital, school;
(2) Residence community, villa district, village, town;
(3) Station, airport, seaport and dock;
(4) Factory, mine, army, beauty spot;
(5) All kinds of industrial sewage similar to the living sewage, etc


3. Product advantages
1, Compact design, which is easy to transport.
2, Integrated device, no need construction, which is easy to be installed.
3, Full Automatic machine, which is easy to operate and maintain.
4, Can be fixed on underground, which can save room and earth. 
5, Don't need additional construction, the total cost is small.
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment


4. Technical flow
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment


Work principle:
The sewage enters the grid well first, and after removing the particulate matter from the grille, it enters the regulating tank, adjusts the water quality and quantity, and then is pumped to the primary sedimentation tank by the lift pump. The wastewater flows to the Class A biological contact oxidation tank for acidification hydrolysis and nitrification. Denitrification, reduce the concentration of organic matter, remove part of ammonia nitrogen, and then enter the O-level biological contact oxidation tank for aerobic biochemical reaction. Most of the organic pollutants are degraded by biooxidation, and the effluent flows to the secondary sedimentation tank for solid-liquid treatment. After separation, the supernatant of the sedimentation tank flows into the clear water tank, and the disinfection equipment is used to kill the harmful bacteria in the water and reach the standard discharge. The debris left by the grille is periodically loaded into the trolley and dumped to the garbage dump. The sludge in the secondary sedimentation tank is partially returned to the A-stage biological treatment tank, and the other sludge is discharged to the sludge tank for sludge dewatering and periodically sucked. The supernatant of the sludge tank is returned to the conditioning tank for further treatment.
 
Technical data

Model

TLDM-1

TLDM-2

TLDM-3

TLDM-5

TLDM-7

TLDM-10

TLDM-15

TLDM-20

Water capacity(m³/h)

1

2

3

5

7

10

15

20

Air blower

Air volume(m³/min)

0.31

0.59

0.67

1.02

1.72

2.5

4.11

4.11

Wind pressure(m.mH2O)

5000

5000

5000

5000

5000

5000

5000

5000

Power(kw)

0.55

0.75

1.5

1.5

2.2

3.7

5.5

5.5

Feeding pump

Flow(m³/h)

1

2

3

5

7

10

15

20

Lift(m)

8

8

8

8

8

8

8

8

Power(kw)

0.55

0.55

0.55

0.75

0.75

0.75

0.75

0.75

The measure of area(m²)

6

10

14

14

28

39

58

975


Note: we can design the different size based on the different water capacity(m3/h),water quality(COD,BOD,SS)and different outlet water standard.
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment

5. Packing&shipping
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment


6. Our services
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment


7. Company profile
 

Shandong Tianlang Environmental Protection Technology Co., Ltd. is a high-tech enterprise integrating environmental equipment production and R&D. The company is located in Zhucheng City, Shandong Province, with beautiful scenery.  It has convenient transportation because it nears Qingdao and Rizhao seaport.

Covering an area of 80,000 m2, the company has advanced production line and production technology. By absorbing the advanced manufacturing concepts and sewage treatment experience of the same industry at home and abroad, it has cooperated with many well-known sewage treatment experts and universities. It has Strong non-standard design and manufacturing capabilities, perfect production testing equipment, complete manufacturing specifications, stable and reliable product quality.

As a production and research enterprise for environmental protection equipment, the company mainly develops and produces sewage treatment equipment, sludge dewatering equipment, waste gas treatment equipment, manure fermentation equipment and waste incinerator. Products are widely used in agriculture, aquaculture, petroleum, chemical, paper, pharmaceutical, food, starch, metallurgy, slaughter, printing and dyeing and other fields. There are dissolved air flotation machine, integrated sewage treatment equipment, MBR bioreactor, mechanical filter, disinfection equipment; belt filter press, plate and frame filter press, screw dewatering machine and waste incinerator nearly 100 kinds of products and accessories. trusted by the majority of users, it become the backbone of China's environmental protection industry.

In the face of fierce competition in the market, our company adheres to the business philosophy of "Focus on quality, keen on innovation", continuously strengthens the product research and development, so that the product has a broader market.                   

Looking forward to the future, we will continue to provide more high-quality products and prompt and sincere service to customers, and supply environmental protection solutions to you.

Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment

8. Certifications
Integrated Sewage Electroplating/Pharmaceutical Wastewater Treatment Equipment

FAQ:

Q:How to buy your idea products?
A:You can provide us your sewage sources,sewage quality  ( COD, BOD, SS) , flow rate and ground area (connect us for more details).


Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

Q:How to pack the products?
A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

Q:How to keep your equipments from corrosion? 
A:We use the world-famous paint, like epoxy-coal tar pitch etc. What's more, we paint strictly according to the standard process.

Q:How to install after the equipments arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.