kexinda ridge cap forming machine
china manufacturer
Our advantageous:
1: Factory direct supply price.
2: We have exported for more than 10 years.
3: Our customer are from about 34 countries.
4: We have the professional research team. We can make the machine according to your requirement.
5: High-end and high-grade design
6: Free technical support and Free accessoies supply.
1.Main parameter of metal ridge cap roofing machine
Technical parameters: |
1 | Name of commodity & specification | metal ridge cap forming machine |
2 | Step of forming roller : | 12 steps |
3 | Diameter of shaft (solid shaft): | 70mm |
4 | Material of shaft (solid shaft): | (high grade) 45# Steel,quenching and tempering treatment |
5 | Voltage | 380V /3phase/ 50 HZ (or as your requirement) |
6 | Control System | PLC Delta Inverter |
7 | Main Frame | 300mm H-Beam |
8 | Backboard Thickness | 14mm |
9 | Chain Size | double 0.6' |
10 | Feeding Material | color steel coils |
11 | Feeding Thickness | 0.3-0.8mm |
12 | Productivity | 1-4m/min |
13 | Motor power : | 3KW (main motor) + 3KW (hydraulic station) |
16 | Cutter material | Cr12, quenching 58-62 °. |
17 | Cr-Plating Size | 0.05mm |
18 | Overall Size | 8500×1200×1500mm |
19 | profile of the machine | as customer request |
20 | Components | Manual uncoiler, Roll forming machine, computer control system, hydraulic control system, cutting, run out table |
|
|
|
|
|
We design each machine according to user requirement. Below techinical parameters can be adjusted if needed.
2.the picture of the ridge cap profile roll forming machine
3.The production process
Decoiler→Flating→Feeding →Forming→Cut to length→Colletion---(finish goods)
4.Production Flow
5.Packaging & Shipping
Main machine is nude, the computer control box is packed with wooden frame
6.company overview
7.FAQ
1:How to play order: Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2:How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
If any questions,you can call me mobile phone at any times
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
4:If you want to get more pictures or videos of the machines,I can send them to you by Email or SKype.
8.Contact information
CONTACT PERSON:helen wang