China Steel Profile Roof Wall Panel Metal Roll Former Aluminium Glazed Tile Roll Forming Machine, Find details about China Archaized Glazed Roll Forming Machine, Metal Sheet Roll Forming Machine from Steel Profile Roof Wall Panel Metal Roll Former Aluminium Glazed Tile Roll Forming Machine
1. the advantage of Glazed Tile Roll Forming Machine china
it has reasinable structure, beautiful appearance, with advantage of saving space, easy operate and especially welcomed by the costomer with limit area or site operation.
2. Main Parameter and specification of the glazed Tile Roll Forming Machine China
We design each machine according to user requirement. Below techinical parameters can be adjusted if needed.
Technical parameters:Lastest arrival color glazed tile forming machine | ||
1 | Main motor power | 4kw |
2 | Hydraulic motor power | 3kw |
3 | Hydraulic Pressure | 18-20MPa |
4 | Voltage | 380V /3phase/ 50 HZ (or as your requirement) |
5 | Control System | PLC Delta Inverter |
6 | Main Frame | 300mm H-Beam |
7 | Backboard Thickness | 14mm |
8 | Chain Size | doouble 0.6' |
9 | Feeding Material | color steel coils |
10 | Feeding Thickness | 0.3-0.8mm |
11 | Feeding Width | as customer request |
12 | Effective width | as the drawing |
13 | Productivity | 1-4m/min |
14 | Roll Station | 16 |
15 | Roller Diameter | 80mm |
16 | Roller material | 45# steel Rolling chromium thickness:0.05 mm |
17 | Cutter material | Cr12 , quenched |
18 | Cr-Plating Size | 0.05mm |
19 | Overall Size | 8000×1200×1100mm |
20 | Total Weight | 5.5T |
21 | Components | Manual Uncoiler-------------------1 set |
3.the picture of the archaized glazed tile forming machine
4.Packaging & Shipping
Main machine is nude, the computer control box is packed with wooden fram
5.FAQ
1:How to play order: Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2:How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
If any questions,you can call me mobile phone at any times:0086-15075710422
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
4:If you want to get more pictures or videos of the machines,I can send them to you by Email or SKype.