Concrete Placing Boom 32m Inner Climbing

China Concrete Placing Boom 32m Inner Climbing, Find details about China Concrete Pump, Concrete Mixing Plant from Concrete Placing Boom 32m Inner Climbing

Model NO.
PB32A-3R-II
Trademark
TRUEMAX
Specification
1 unit/1*40HQ+1*20GP
Origin
Zhejiang China
Model NO.
PB32A-3R-II
Trademark
TRUEMAX
Specification
1 unit/1*40HQ+1*20GP
Origin
Zhejiang China
Placing boom equipped with automatic climbing mechanism, climbing by hydraulic cylinder when the building height is over than placing boom. Placing boom can climb through climbing mechanism as the floor raised instead of manual transport, dismantling and connecting pipes, saves time and more efficient. Only need 1-2 workers to control arms through a radio remote control and cable remote control. Within the working range, it can pour concrete accurately without any interrupt, so as to shorten the concrete pouring time, improve work efficiency and casting quality, reduce the labor intensity.
Suitable for high building, bridge, and dams which have lift shaft or floor can be opened

Technical Features
  1. Three arms design, "R" folding. The machine is fully driven by hydraulic and slewing flexibly, with wide working range. Arms adopt high strength steel plate which is stronger and lighter.
  2. With the counterweight guarantee the stability and safety
  3. Two modes of operation: wireless remote control and cable remote control, easy to operate.
  4. Inner-climbing frames: floor frames or wall (lift or shaft) frames, which are suitable for different jobsites.
  5. According to customer requirements, Switch control and electric-hydraulic proportional control(optional) are available .
  6. The main electronic components are products of the world-famous brand, with high-quality.
Main Parameters
ModelPB32A3R(HG32A3R)
Max Radius of placing boom (m)31.7
Stationary height (to the join between the end of the boom and swivel table)(m)22.6
Slewing range (°)360
Power of motor (KW)15
Pressure of hydraulic system (MPa)28
Type of hydraulic oilHM46
Arms length(m)1st section14.5
2nd section9.2
3rd section8.0
Boom articulation (°)1st section0~86
2nd section0~180
3rd section0~180
Interval of climbing frame (m)Climbing3.0~4.2
Placing concrete/resting6.0~8.4
Delivery pipe dimension (mm)DN125
Delivery hose dimension (inside diameter×length) (mm)5″×3000
Mode of operationCable Remote Control
Radio Remote Control
Wind speed (m/s)Placing concrete≤13.8
Climbing≤7.9
Working temperature (°C)-20 ~ 48

Project Case
 Concrete Placing Boom 32m Inner Climbing Concrete Placing Boom 32m Inner ClimbingConcrete Placing Boom 32m Inner Climbing Concrete Placing Boom 32m Inner Climbing
Concrete Placing Boom 32m Inner Climbing

Concrete Placing Boom 32m Inner Climbing