Plastic Injection Mould for Washing Machine.

China Plastic Injection Mould for Washing Machine., Find details about China Auto Gas Assisted Parts, Injection Mould from Plastic Injection Mould for Washing Machine.

Model NO.
2020.6.19
Runner
Cold Runner
Installation
Fixed
Certification
TS16949, ISO
Standard
HASCO
Customized
Customized
Mould Life
50~100K Shots
Mould Steel
2738hh,Nak80,738,2344,S136,Sdk61,P20,Px5
Lead Time
35-45 Days
Material
PP
Trademark
Higrade
Transport Package
Wooden Case
Specification
ISO9001: 2015
Origin
China Qingdao
HS Code
8480710090
Model NO.
2020.6.19
Runner
Cold Runner
Installation
Fixed
Certification
TS16949, ISO
Standard
HASCO
Customized
Customized
Mould Life
50~100K Shots
Mould Steel
2738hh,Nak80,738,2344,S136,Sdk61,P20,Px5
Lead Time
35-45 Days
Material
PP
Trademark
Higrade
Transport Package
Wooden Case
Specification
ISO9001: 2015
Origin
China Qingdao
HS Code
8480710090
Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100k shots
Material: PP
Cavity: 1*1
Applicable range: Automotive
Lead Time: 35-45 days
Hot runner:Yes (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Plastic Injection Mould for Washing Machine.

Process step: product design-CAE-3D mold design-2D drawing-CAM-milling machine-grinder-drill-CNC-wire cutting-EDM-polishing-trial assembly-grind-assemble-first trial

Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
 Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's request
Packing: Wooden Case
Plastic Injection Mould for Washing Machine.

The first trial success rate is above 95%
Quotation : provide quotation in 24hours after received the customer's drawing .
Design software: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet the customer request of batch production.
Quality department:15 members quality control workers, testing the mould and parts by CMM and projector.
Domestic delivery: logistics transportation
Delivery to overseas: FOB/CIF/DDU by sea shipping or air shipping

Plastic Injection Mould for Washing Machine.