Coralfly Truck Excavator Fuel Water Separator Filter 600-311-4510 Fs550937 Stcx021 P550937 for Komatsu Vmc China Local Donaldson Filter, Find details about China Komatsu Filter 600-311-4510, Komatsu Separator Filter from Coralfly Truck Excavator Fuel Water Separator Filter 600-311-4510 Fs550937 Stcx021 P550937 for Komatsu Vmc China Local Donaldson Filter
Outer Diameter | 118.4 mm (4.66 inch) |
Thread Size | 1 1/4-12 UN |
Length | 311 mm (12.24 inch) |
Gasket OD | 110 mm (4.33 inch) |
Gasket ID | 98 mm (3.86 inch) |
Efficiency 99% | 10 micron |
Efficiency Test Std | SAE J1985 |
Emulsified H2O Efficiency | 95 Percent |
Type | Water Separator |
Style | Spin-On |
Media Type | Cellulose, Meltblown |
Primary Application | KOMATSU 6003114510 |
Notes | Not for Marine Applications |
CHINA LOCAL | STCX021 |
KOMATSU | 6003113400 |
VMC | FS550937 |
Service provide:
OEM ODM & OBM service; Coralfly packaging or according to customer's need packaging
Quality Guarantee:
If there have any quality problems with CORALFLY products, we are willing to be replaced free.
After-sales service:
There is any problem caused by using CORALFLY products:
1). Keep the defective products and contact with Coral Machinery or Coral Machinery distributor
of your religion timely.
2). Do not cut or change any suspected problem products, if necessary, Send the suspected filter
and the attached oil and the coolant sample together to Coral Machinery or Coral Machinery
distributor of your religion timely.
3). Attached with repair document, parts list, labor costs and any other materials which can support
a claim for compensation.
6.Our Company
7.FAQ
1. What's Minimum Order Quantity?
A: Each item and/or color has a minimum order quantity, which would be stated in our quote sheet.
Assorted items would be negotiable upon request.
2. What's kind of your packaging?
Coralfly packaging or customer's requirements.
3. Could I get some samples? How could i pay the sample payment?
A: We are honored to offer you samples. We accept the sample payment
via Western Union or Bank of China.
4. How long is your Delivery Lead Time ?
A: If there is stock, the lead time is about one week after we get the payment,
if need to be produced, 7-20 days after we get the prepay.
5. Could you Calculate the shipping cost for me?
A: Yes, we are honored to do that for you! Before the freight ,
please well let us know which seaport or airport near your place.