China Chiller for The Production of Plastic Tubes, Find details about China Water Chiller + Chromeplate/Zinc/Nickel Plating, Chiller from Chiller for The Production of Plastic Tubes
Model No. | RHP -1/2A | RHP -001A | RHP -002A | RHP -003A | RHP -004A | RHP -005A | RHP -006A | |
Refrigeration Capacity | 50HZ- KW | 1.53 | 2.94 | 5.67 | 8.39 | 10.9 | 13.95 | 16.9 |
50HZ- Kcal/h | 1316 | 2528 | 4872 | 7216 | 9374 | 11990 | 14530 | |
60HZ- KW | 1.79 | 3.44 | 6.63 | 9.82 | 12.75 | 16.32 | 19.77 | |
60HZ- Kcal/h | 1540 | 2958 | 5701 | 8442 | 10968 | 14028 | 17000 | |
Power Supply | 1N - 220V - 50HZ/60HZ | 3N - 380V/415V - 50HZ/60HZ | ||||||
Refrigerant | Type | Standard R-22 / Eco-friendly type R134a or R407c | ||||||
Control | Capillary | |||||||
Vol (kg) | 0.6 | 0.8 | 1.8 | 2.7 | 3.5 | 4.3 | 5 | |
Compressor | Type | Scroll Type | Piston Type | |||||
Qty | 1 | |||||||
Input(kw) | 0.55 | 0.75 | 1.5 | 2.25 | 3 | 3.75 | 4.5 | |
Cooling Flow Rate | m3/h | 800 | 1000 | 2000 | 3000 | 4000 | 5000 | 6000 |
Freezing Water Flow | 50HZ- m3/h | 0.26 | 0.51 | 0.97 | 1.44 | 1.87 | 2.4 | 2.91 |
60HZ-m3/h | 0.31 | 0.59 | 1.14 | 1.68 | 2.19 | 2.81 | 3.41 | |
Tank (m3) | 0.022 | 0.028 | 0.038 | 0.038 | 0.065 | 0.065 | 0.11 | |
Pipe Dia. | G 1/2" | G 1/2" | G 3/4" | G 3/4" | G 3/4" | G 1" | G 1" | |
Buit-in Water Pump | Power (kw) | 0.2 | 0.2 | 0.55 | 0.55 | 0.55 | 0.55 | 0.55 |
Lift (Kpa) | 180 | 180 | 210 | 200 | 200 | 200 | 200 | |
Size | L(mm) | 600 | 600 | 820 | 945 | 945 | 1035 | 1035 |
W(mm) | 400 | 400 | 460 | 565 | 565 | 610 | 610 | |
H(mm) | 940 | 940 | 1155 | 1365 | 1365 | 1365 | 1365 | |
Weight | KG | 45 | 60 | 120 | 130 | 160 | 170 | 250 |
Main Components
Working Principle
Applications
Coating Systems - Chemical & Pharmaceutical Processes - Plastics Processing - Thermoform Machines - Plasma Coating - Medical Imaging Systems - Food & Beverage Industry - Electroplating Baths - Biogas & Natural Gas Treatment - Compressed Air Treatment - Extruders - Surface Processing - Flexographic Printing Systems
Package & Shipping
Use standard export plywood case with forklift truck feet, easy to load and unload
5-7 days to finish the production after receiving the deposit
Shipping by LCL or FCL
Why Choose Us?
It's easy to cooperate with our company, you do not need to worry about anything.
1. CE approved, meet ISO 9001 standard.
2. Assembled package and only need to connect the pipes on jobsite.
3. Complete commissioning before delivery.
4. Low failure and low maintenance cost.
5. Custom-made is available.
6. Very fast delivery.
7. Have 7/24 after-service.
8. 24months quality warranty.
After-sales service