China Changyuan Hot DIP Galvanized Steel Fiber Cable Clamp High Strength Drop Cable Clamp Terminal Block Jumper Clamp, Find details about China Clamp, Electric from Changyuan Hot DIP Galvanized Steel Fiber Cable Clamp High Strength Drop Cable Clamp Terminal Block Jumper Clamp
Packaging Details
bags /cartons +pallets or according to the needs of clients
Port
shanghai port
Lead Time :
within 3-15 days
1. As a professional manufacturer, we have rich experience in OEM
2. Our quality and quality are first-rate
3. Our products undergo 100% QC inspection before shipment.
4. Professional after-sales service team.
Catalog No. | Suitable Conductor | Dimensions(mm) | Weight(kg) | |||
D | d | L1 | L2 | |||
JYT-35/6 | LGJ-35/6 | 16 | 9.5 | 60 | 65 | 0.41 |
JYT-50/8 | LGJ-50/8 | 18 | 11 | 60 | 65 | 0.45 |
JYT-70/10 | LG J-70/10 | 22 | 13 | 70 | 65 | 0.54 |
JYT-95/15 | LGJ-95/15 | 26 | 15 | 80 | 65 | 0.62 |
JYT-120/7 | LGJ-120/7 | 26 | 16 | 80 | 85 | 0.6 |
JYT-120/20 | LGJ-120/20 | 26 | 16.5 | 80 | 85 | 0.58 |
JYT-150/8 | LGJ-150/8 | 30 | 17.5 | 90 | 85 | 0.84 |
JYT-150/20 | LGJ-150/20 | 30 | 18 | 90 | 85 | 0.84 |
JYT-150/25 | LGJ-150/25 | 30 | 18.5 | 90 | 85 | 0.84 |
JYT-185/10 | LGJ-185/10 | 32 | 19.5 | 90 | 85 | 0.94 |
JYT-185/25 | LGJ-185/25 | 32 | 20.5 | 90 | 85 | 0.9 |
JYT-185/30 | LGJ-185/30 | 32 | 20.5 | 90 | 85 | 0.9 |
JYT-210/10 | LGJ-210/10 | 34 | 20.5 | 100 | 85 | 1.18 |
JYT-210/25 | LGJ-210/25 | 34 | 21.5 | 100 | 85 | 1.14 |
JYT-210/35 | LGJ-210/35 | 34 | 22 | 100 | 85 | 1.1 |
JYT-240/30 | LGJ-240/30 | 36 | 23 | 110 | 85 | 1.21 |
JYT-240/40 | LGJ-240/40 | 36 | 23 | 100 | 85 | 1.21 |
JYT-300/15 | LGJ-300/15 | 40 | 24.5 | 110 | 105 | 1.74 |
JYT-300/25 | LGJ-300/25 | 40 | 25 | 110 | 105 | 1.74 |
JYT-300/40 | LGJ-300/40 | 40 | 25.5 | 110 | 105 | 1.74 |