China Multi-Layer PE PP WPC Plastic Building Template Foam Board Making Machine with Top Technology, Find details about China Building Template Machine, Building Template Making Machine from Multi-Layer PE PP WPC Plastic Building Template Foam Board Making Machine with Top Technology
Company | Jiangsu Acemien Machinery Co.,ltd |
Address | No 2,Changhong Road,Modern Agriculture Demonstration Park,Zhangjiagang City, China |
Area | ≥ 10000 square meter |
Manpower | ≥ 80 persons |
Certification | CE |
Professional manufacture | 1) Plastic waste film/ bottle recycling and washing machine 2) Plastic Roof Tile Machine 3) PVC Roof Tile Machine 4) PVC Corrugated Tile Production Line 5) PE,PVC,PP-R,PERT solid pipe extrusion line 6) WPC,PVC profile,door panel,foamed panel,ceiling panel extrusion line 7) Plastic granulating machine 8) Auxiliary machine,such as mixer,crusher,pulverizer etc. |
No. | Machine | Qty. |
1 | Screw loader | 1set |
2 | ASM110/35 single screw extruder | 1set |
3 | Screen changer | 1set |
4 | Metering pump | 1set |
5 | Extrusion mould | 1set |
6 | Calibration mould | 1set |
7 | Mould shelf | 1set |
8 | Vacuum calibration table | 1set (3 groups) |
9 | Mold temperature controller | 1set |
10 | Vacuum system | 1set |
11 | Chiller | 1set |
12 | Haul-off unit with 6 rollers (Forward) | 1set |
13 | Trimming device | 1set |
14 | Haul-off unit with 2 rollers (Backward) | 1set |
15 | Cutter | 1set |
16 | Belt conveyor | 1set |
17 | Electrical control system | 1set |
Temperature & Humidity | ≤40ºC, ≤95% |
Power supply | 3-phase, 380 V, 50 Hz(or customized) |
Wire/cables: | Wires/cables from power supply to control cabinet of this production line; |
Cooling Water hose/pipe | Water supply to machines and pools |
Lubrication oil: | Sinopec, Exxon mobile |
Installation power | Total 250Kw, Actual consumption about 130Kw |
Cooling Water | 5M3 / h; 20ºC |
Compressed air | 1M3 / h, 0.5-0.7Mpa |
Manpower | 3 Persons/shift(24 hours need 2-3 shifts) |
After shipping,two engineers will go to customer's company to install and test machine,and teach customer's workers the operative skills. |
- pre-sales services: we will take customers to visit our factory and check the machines quality from airport/bus station/train stations. - we will re-designed the machines according to customer's different raw material formulations: driving motors power, electric power model, control method etc. |
- after sales services: we will offer electric diagram, installation diagram, usage manual. - we will offer the customers online introduction to solve the machines problems/send engineers for customers machines installation, running test, workers training, machines repairmen services etc. - we will offer customers spare parts at cost prices all life long of the machines . |
Payment: T/T,L/C Delivery: 45-90 days Origin: China Minimum Order: 1 set Packing: wooden case with plastic film(also can according to customer's requirements) Inspection: in house Guarantee: 12months |