Timer for Solenoid Valve (XY-11)

China Timer for Solenoid Valve (XY-11), Find details about China Digital Timer, Timer from Timer for Solenoid Valve (XY-11)

Model NO.
XY-11
PLC Type
SD PLC
Manual Override
Test
Trademark
RFS
Transport Package
Carton
Specification
Digital Timer
Origin
China
Model NO.
XY-11
PLC Type
SD PLC
Manual Override
Test
Trademark
RFS
Transport Package
Carton
Specification
Digital Timer
Origin
China
Timer for solenoid valve --XY-11
Timer for Solenoid Valve (XY-11)
Specification

The covering makes from good quality engineering plastic which is flame retardant, high intensity and security.
Supply voltage24..240V AC/DC 50Hz/60Hz for "CE" marked timerDuty cycle100%ED
Absorption current4mA MaxSwitch life3x108
Operating temperature-10ºC~+50ºCTime ONfrom 2s
Class protectionIP65-EN60529Time OFFfrom 0.5 to 120 min
Switch holding voltage400V MaxIndicatorsYellow LED
Switch capacity1AManual overrideTest
Inrush current10A for 10msTerminationDIN43650B

Drawing
Timer for Solenoid Valve (XY-11)
Related products
Timer for Solenoid Valve (XY-11)Timer for Solenoid Valve (XY-11)Timer for Solenoid Valve (XY-11)


Company information
Timer for Solenoid Valve (XY-11)
Xingyu Electron(Ningbo)Co.,Ltd. is one of the key enterprises in Chinese pneumatic and valve industry,We specialize in development,manufacturing, marketing and service of pneumatic actuator,angle seat valves,solenoid valves,solenoid coils and DIN connectors;
"Not to be the biggest,but to be the strongest" is our business goal and ideal,let us make best efforts for a better future.


Brief Introduction:
--Approx 30 years' experience in manufacturing solenoid coils;
--Started to make solenoid valves & pneumatic actuators since 2004;
--ISO 9001 and IATF16949 certificated company;
--Main products: pneumatic actuator, Angle seat valves, Solenoid valves, solenoid coils,
  Digital pressure switch, Vacuum generator, E/P regulator;
--Application: Pneumatic & Hydraulic industries, fluid control system,
  air and water treatment system, Automatic industry, etc;



FAQ
Q:Are you a trading company or a factory?
A: We are a factory, manufacturer solenoid coils since year 1990.

Q:After an order is placed, when to deliver?
A: Generally about 10-25days, If we have inventory, we can arrange shipment within 3 days. 
     Please be aware that our production lead times depend on specific items and item quantities. 

Q:What about the warranty ?
A: Normally it is guaranteed for 12 months since dispatching from factory

Q: Can you customized the products?
A: Yes, we have professional R&D team, we supply customized products to customers