China Large Capacity Equipment Spiral Separator for Chrome Ore Processing, Find details about China Equipment for Chrome Ore, Chromite Ore Processing Equipment from Large Capacity Equipment Spiral Separator for Chrome Ore Processing
Spirals are gravity concentrators and separate minerals of different specific gravity according to their relative movement in response to gravity, centrifugal force and other forces in the fluid medium. It has extremely good performance and effects in processing placer of beach, riverside, seashore and stream.
Our Spirals are made of polyurethane lined fiber glass with wearable corundum inner surface.
Generally there are 5 turns in one start, single, twin, triple and quad starts available per column to suit capacity requirements.
projects on site
Model | 5LL-1500 | 5LL-1200 | 5LL-900 | 5LL-600 | 5LL-400 | |
Outside dia ( mm ) | 1500 | 1200 | 900 | 600 | 400 | |
pitch ( mm ) | 540,720 | 900,720,540 | 675,540,405 | 450,360,270 | 240,180 | |
Pitch Dia Ratio | 0.75,0.6,0.45 | 0.75,0.6,0.45 | 0.75,0.6,0.45 | 0.75,0.6,0.45 | 0.6,0.45 | |
Lateral slope | 9 ° | 9 ° | 9 ° | 9 ° | 9 ° | |
Maximum starts per column | 4-2 | 4-2 | 4-2 | 3 | 2 | |
Feeding Size(mm) | 0.3-0.02 | 0.3-0.03 | 0.3-0.03 | 0.2-0.02 | 0.2-0.02 | |
Feeding Density(%) | 25-55 | 25-55 | 25-55 | 25-55 | 25-55 | |
Capacity ( T/H ) | 8-6 | 4-6 | 2-3 | 0.8-1.2 | 0.15-0.2 | |
External Size | Length(mm) | 1560 | 1360 | 1060 | 700 | 460 |
Width(mm) | 1560 | 1360 | 1060 | 700 | 460 | |
Height(mm) | 5230 | 5230 | 4000 | 2600 | 1500 | |
Weight (Kg) | 800 | 600 | 400 | 150 | 50 |
1. All the goods will be delivered in 15-30 working days after receiving payment.
2. The machine will be packed in export container.
3. Motors and small parts will be packed in new strong wooden cases that suitable for long distance ocean transportation.
4. We promise that your goods will be shipped to destination timely and safely.
Q1. Can I visit your factory?
A: Yes. Many domestic and overseas customers visited our factory every year.
Q2. What about the warranty of your equipment? Do you supply spare parts?
A: Our warranty is one year(12 months), and we can supply spare parts also.
Q3. Do you provide after-sales service?
A: Yes. We have a professional after-sale
service team to promptly and thoroughly solve your problems.
Q4. Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment
installation, adjustment, and operation training. All of our engineers have passport.
Q5. Do you provide producution flow chart?
A: Yes. Our experienced engineers are specialized in designing process flow for
various ores beneficiation, including iron ore, tin ore, copper ore, gold ore,
lead zinc ore, manganese ore, etc.
Q6. Can you test our sample ore?
A: Yes. You can send your samples to us for testing and analysis.
Q7. Have you made the whole ore dressing lines?
A: Yes. We have made many large&small scale ore dressing lines at home and abroad.