China Dongsheng Steel Casting Enclosed Shell Press, Find details about China Vibrating Shell, Shell Press from Dongsheng Steel Casting Enclosed Shell Press
Standard air pick | B87 |
Working pressure | 0.63Mpa |
Shell frequency | ≥20HZ |
Impact energy | 100±10% |
Air consumption | ≤55±5L/S |
Working noise | ≤80dB |
Maximum workpiece size that can be processed | 500mm*450mm |
Power intensity | 220V 50Hz |
Installed power | 0.5KW |
Dimensions | 1500mm*1400mm*3100mm |
Weight | 1.2t |
Movable type conveyor technical parameters
Conveyor specifications | 700*6 Rubber pattern flat belt |
Rotating speed | 40m/min |
Transmission distance | 1.5m |
Power intensity | 380V 50Hz |
Installed power | 1.1KW |
Dimensions | 2000mm*8000mm*1000mm |
Weight | 200kg |
1.Description
This equipment is one of the ideal equipment for shell shock in investment casting industry, and is necessary for sand shell removal of casting.Manual loading and unloading, automatic compression, automatic shell shock, closed low noise, with a visual window, with a mold shell conveyor, the machine has the advantages of simple operation, stable and reliable performance, high efficiency, easy maintenance and so on.
2.Structure description
2.1. The machine body adopts integral welding with reliable mechanical strength.
2.2.the machine automatically open and close the door, automatic shell shock, low labor intensity, high efficiency, high safety.
2.3.The machine USES B87C crusher to provide impact energy. The impact operation is carried out by remote pneumatic control.
2.4.the machine adopts the enclosure type sound insulation, sound absorption system, so that the equipment and the outside world in the shell completely isolated, blocking the air transmission
2.5. Noise, and make the earth absorb vibration energy, ensure that the working noise of the machine is less than 80dB.
2.6. The machine is equipped with automatic door opening. After installation, press one key and start the button to close the door instantly.
Stop vibration - open the door
2.7. The machine adopts the pressed shell to hang the casting casting cup. The shell has short time and high efficiency, so as to avoid damage to the lower parts of the shell.
2.8. The machine is provided with an observation window, and an observation lamp is installed inside the device, so that the operator can monitor the vibration shell status of the parts.
2.9. The machine is equipped with a conveyor belt of mold shell, which can transport the mold shell to the specified location, saving manpower and material resources, good working site environment, low labor intensity of workers.
2.10. The machine is equipped with complete electric control system and gas distribution system, which is convenient for operation and installation.
FAQ: |
Q1: How long can it be delivered after the order is placed? |
Most of our machines are customize ordered, they can be delivered within 30-60 days after the order is placed; |
Q2:How can I pay for the money for the machine. |
We accept 30% as a deposit and the balance need to be paid by T/T before the machine shipping out. |
Q3: What should I do if I find quality problems in the process of using my product? |
In case of quality problems, if you need after-sales service, you can contact us through wechat / whatsapp: for communication and solution; our engineers provide 24-hour online guidance to solve the problems. |
If you need to replace the parts, we will provide them to you in the first time through international express after paid. |
Q4: Can I choose to buy equipment through Made-In-China company? |
If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way. |
Q5: Does the machine have an English manual and warranty card? |
Each machine has a professional English operation manual. The warranty period of our machine is one year, except for human factors or wearing parts. |
In addition, we can provide electronic version of the English manual. |
Q6: The delivery time of products without stock is too long for 30-60 days. |
First of all, we will speed production to meet your needs. |
In addition, the long delivery time is because our technicians need to carefully check and debug the equipment to ensure the quality of the machine. |
Q7: What if I choose the wrong machine? |
We have pre-sales engineers with rich professional knowledge. According to your products, we provide the most suitable machines and solutions. Before placing an order, we make sure you don't choose the wrong machine. If it happen, we will solve the problem with you. |
Q8: Who is responsible for the installation and debugging of the machine I purchased? |
We the seller are fully responsible to send our engineers within two weeks from the date of the containers arrival to the buyers factory to commissioning the machine and training the staff of the buyer, the buyer should be responsible for a round trip economy ticket, a hotel and any other necessary accommodations for the seller's engineers. |