Dongsheng Frame Tank-Free Wax Injector Stainless Steel Casting

China Dongsheng Frame Tank-Free Wax Injector Stainless Steel Casting, Find details about China Wax Injector, Wax Injection from Dongsheng Frame Tank-Free Wax Injector Stainless Steel Casting

Model NO.
DMY50-C
Origin
China
Model NO.
DMY50-C
Origin
China
Dongsheng Frame Tank-Free Wax Injector Stainless Steel Casting
Clamping forceT50
Working pressureMpa16
Hydraulic oil pumpLxkg/cm230*140\PV2R2-33
Clamping screwmmM14
Clamping strokemm750
Maximum opening distancemm900
 
working desk sizemm1000*1000
Deep throatmm850
Wax injection pressurekg/cm210-100
Single shotL14
Wax injection timesec999
Wax nozzle height adjustmentmm700
Wax nozzle advance and retreat adjustmentmm250
Wax nozzle aperturemm6-8
Hydraulic oil storageL200
Heating tube powerKW6
Capacity of ointment barrelL180
Voltage specifications60/50Hz220V/380vx3P
Rated currentA36
Total WeightT5

Main fatures and advantages

1.Intelligent PLC controlled, enhance production efficiency and pattern accuracy.
2.Machine adopts advanced hydraulic design,when pressing large pattern, wax in main reservoir tank can not fully fill the mold, under this situation,auxiliary tank will continue to inject wax into mold till pattern formed. During this process, pressure always above 20Mpa, clamping force 50t. clamping and injecting pressure and flow are adjustable. Equipment can adapt to different products, increase application scope and adaptability.
3. After wax injection, pressure preservation, and mold injection process, system will automatically open overflow valve, that means hydraulic oil will return to cooler under standby state, so as to prolong motor service life and enhance hydraulic system reliability and stability. Machine also equipped with platen thermostatic apparatus, which can effectively avoid flow mark for big pattern more than 10kg, and can uniquely improve wax pattern surface quality & dimensions control.
4.Secondary pressurizing can prevent large and thick pattern from denting. First low-pressure injection achieve quick mold-filling, then changeover to high pressure-injecting to ensure pattern and mold surface contact closely. The pattern will be passed tightly, and contraction effectively controlled.
5. Injection nozzle automatically adjusted UP/DOWN or IN/OUT.
6.Fulfill industrial automation, automated wax transfer system can reduce loss & idle during wax treatment process. 



Transport package
Packed with steel structure and MDF to ensure the safety of equipment during transportation.

Dongsheng Frame Tank-Free Wax Injector Stainless Steel Casting


About us

Founded in December 1993, Dongying Dongsheng Casting Co., Ltd. is one of the largest and earliest factories engaged in the development, development and production of precision casting equipment. The company is located in the hinterland of Shengli Oilfield in the beautiful Yellow River Delta.
    According to the development requirements of precision casting enterprises, the company has determined the development concept of products with high efficiency, innovation, energy saving, environmental protection, high quality, safety and reliability, and is aggressive and striving to be in line with international standards. The company has passed the ISO9001: 2000 international quality management system certification and the EU CE certification. In May 2014, it was selected by the China Foundry Association as "the leading enterprise in the foundry equipment industry in China's foundry industry"
    As a member of China Precision Casting Association, the company is willing to develop together with colleagues in the precision casting industry with first-class equipment, first-class service and first-class reputation, and create brilliant together.
    We are the best vendor in the running market. Our own factory van make sure the stable shipping time and the best quality with a reasonable price. We also have the best service in the city, if u have any question, please feel free to connect with us.
Dongsheng Frame Tank-Free Wax Injector Stainless Steel Casting
Address: No. 17, Chuanghui Road, Oilfield Fusion Industrial Park, Niuzhuang Town, Dongying District, Dongying City, Shandong Province

Website: dongshengcasting.en.made-in-china.com  

FAQ:
Q1: How long can it be delivered after the order is placed?
Most of our machines are customize ordered, they can be delivered within 30-60 days after the order is placed;
Q2:How can I pay for the money for the machine.
We accept 30% as a deposit and the balance need to be paid by T/T before the machine shipping out.
Q3: What should I do if I find quality problems in the process of using my product?
In case of quality problems, if you need after-sales service, you can contact us through wechat / whatsapp: for communication and solution; our engineers provide 24-hour online guidance to solve the problems.
If you need to replace the parts, we will provide them to you in the first time through international express after paid.
Q4: Can I choose to buy equipment through Made-In-China company?
If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way.
Q5: Does the machine have an English manual and warranty card?
Each machine has a professional English operation manual. The warranty period of our machine is one year, except for human factors or wearing parts.
In addition, we can provide electronic version of the English manual.
Q6: The delivery time of products without stock is too long for 30-60 days.
First of all, we will speed production to meet your needs.
In addition, the long delivery time is because our technicians need to carefully check and debug the equipment to ensure the quality of the machine.
Q7: What if I choose the wrong machine?
We have pre-sales engineers with rich professional knowledge. According to your products, we provide the most suitable machines and solutions. Before placing an order, we make sure you don't choose the wrong machine. If it happen, we will solve the problem with you.
Q8: Who is responsible for the installation and debugging of the machine I purchased?
We the seller are fully responsible to send our engineers within two weeks from the date of the containers arrival to the buyers factory to commissioning the machine and training the staff of the buyer, the buyer should be responsible for a round trip economy ticket, a hotel and any other necessary accommodations for the seller's engineers.