Dongsheng Casting Wax Melt Machine Wax Heater with ISO9001

China Dongsheng Casting Wax Melt Machine Wax Heater with ISO9001, Find details about China Wax Melt Machine, Static Bucket from Dongsheng Casting Wax Melt Machine Wax Heater with ISO9001

Model NO.
DS
Model NO.
DS
Dongsheng Casting Wax Melt Machine Wax Heater with ISO9001

1.Technical parameters

 
Melting wax barrel volume500L
Melting wax barrel diameter900cm
Rated temperature100ºC
heating power     6kw
Dimensions    Φ1300X1500mm
Weight150kg

2.Description

·The equipment is mainly used for recovery of wax in investment casting industry. The waxes treated in the water bucket were injected into the wax storage barrel, and the waxes were kept at about 80ºC by heating the heater and heat conduction oil.

3. Structure description
·The equipment is composed of three layers, the inner barrel is wax storage barrel, welded with stainless steel;The heating layer is in the middle, which is heated by electric heating tube, and heat conduction oil is installed inside as heat transfer medium.The outer layer is the insulation layer. Automatic temperature control is adopted for heating. The temperature is set by the temperature controller. When the temperature reaches the set value, the temperature controller will automatically cut off the power supply of the heater.It will start automatically when the temperature drops.At the same time, the equipment is equipped with a second-level temperature control. If the temperature of thermal oil rises to a certain value (generally about 50ºC higher than the first-level temperature controller) when the control of the first-level temperature controller fails, the second-level temperature control (temperature controller) functions and the power supply of the electric heating tube is cut off to avoid accidents.


4.Operation and Precautions


4.1.Operating sequence

4.1.1.Add heat conducting oil about 120mm from the top;
4.1.2. Set the temperature required by the temperature controller, which is generally about 90ºC;
4.1.3 Set the temperature of the second temperature controller < 150°
4.1.4 Start the heating power, and the heater starts heating and insulation.


4.2.Matters needing attention

4.2.1 Do not overfill the heat conduction oil to avoid overflow during heating;
4.2.2 The thermal oil shall be replaced regularly, usually once a year, and the oil scale and carbon deposition of the heater shall be removed;
4.2.3 Regularly use the paraffin drain pipe below to discharge the waste wax;
4.2.4 The temperature sensor must be immersed in the oil;
4.2.5 Be careful when extracting wax to avoid burns;


5.Transport package
Packed with steel structure and MDF to ensure the safety of equipment during transportation.
Dongsheng Casting Wax Melt Machine Wax Heater with ISO9001




About us

Founded in December 1993, Dongying Dongsheng Casting Co., Ltd. is one of the largest and earliest factories engaged in the development, development and production of precision casting equipment. The company is located in the hinterland of Shengli Oilfield in the beautiful Yellow River Delta.
    According to the development requirements of precision casting enterprises, the company has determined the development concept of products with high efficiency, innovation, energy saving, environmental protection, high quality, safety and reliability, and is aggressive and striving to be in line with international standards. The company has passed the ISO9001: 2000 international quality management system certification and the EU CE certification. In May 2014, it was selected by the China Foundry Association as "the leading enterprise in the foundry equipment industry in China's foundry industry"
    As a member of China Precision Casting Association, the company is willing to develop together with colleagues in the precision casting industry with first-class equipment, first-class service and first-class reputation, and create brilliant together.
    We are the best vendor in the running market. Our own factory van make sure the stable shipping time and the best quality with a reasonable price. We also have the best service in the city, if u have any question, please feel free to connect with us.
Dongsheng Casting Wax Melt Machine Wax Heater with ISO9001

Address: No. 17, Chuanghui Road, Oilfield Fusion Industrial Park, Niuzhuang Town, Dongying District, Dongying City, Shandong Province

Website: dongshengcasting.en.made-in-china.com  

FAQ:
Q1: How long can it be delivered after the order is placed?
Most of our machines are customize ordered, they can be delivered within 30-60 days after the order is placed;
Q2:How can I pay for the money for the machine.
We accept 30% as a deposit and the balance need to be paid by T/T before the machine shipping out.
Q3: What should I do if I find quality problems in the process of using my product?
In case of quality problems, if you need after-sales service, you can contact us through wechat / whatsapp: for communication and solution; our engineers provide 24-hour online guidance to solve the problems.
If you need to replace the parts, we will provide them to you in the first time through international express after paid.
Q4: Can I choose to buy equipment through Made-In-China company?
If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way.
Q5: Does the machine have an English manual and warranty card?
Each machine has a professional English operation manual. The warranty period of our machine is one year, except for human factors or wearing parts.
In addition, we can provide electronic version of the English manual.
Q6: The delivery time of products without stock is too long for 30-60 days.
First of all, we will speed production to meet your needs.
In addition, the long delivery time is because our technicians need to carefully check and debug the equipment to ensure the quality of the machine.
Q7: What if I choose the wrong machine?
We have pre-sales engineers with rich professional knowledge. According to your products, we provide the most suitable machines and solutions. Before placing an order, we make sure you don't choose the wrong machine. If it happen, we will solve the problem with you.
Q8: Who is responsible for the installation and debugging of the machine I purchased?
We the seller are fully responsible to send our engineers within two weeks from the date of the containers arrival to the buyers factory to commissioning the machine and training the staff of the buyer, the buyer should be responsible for a round trip economy ticket, a hotel and any other necessary accommodations for the seller's engineers.