Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig

China Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig, Find details about China Drilling Rig, DTH Drilling Rig from Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig

Model NO.
370 DTH rig
Degree of Automation
Automatic
Screwdriver Startup Mode
Under pressure
Condition
New
Customized
Customized
Engine
Yc4d95z-T11/4BTA3.9-C110
Dust Removal
Dry/Wet, Optional
Hammer Type (DTH)
Csjb 3.5”/4”/5”/6”
Working Pressure (MPa)
1.05-2.46
Drilling Diameter (mm)
90-165
Drilling Height (M)
3.38
Trademark
KIMDRILL
Transport Package
Plastic Film
Specification
3150× 2170× 2300mm
Origin
China
HS Code
84306919
Model NO.
370 DTH rig
Degree of Automation
Automatic
Screwdriver Startup Mode
Under pressure
Condition
New
Customized
Customized
Engine
Yc4d95z-T11/4BTA3.9-C110
Dust Removal
Dry/Wet, Optional
Hammer Type (DTH)
Csjb 3.5”/4”/5”/6”
Working Pressure (MPa)
1.05-2.46
Drilling Diameter (mm)
90-165
Drilling Height (M)
3.38
Trademark
KIMDRILL
Transport Package
Plastic Film
Specification
3150× 2170× 2300mm
Origin
China
HS Code
84306919
Hydraulic Multifunctional  High Air Pressure DTH Drill Rig

Our DTH drill rig is equipped with new powerful hydraulic powered rotary head and propulsion system, robust chassis and reliable brake system, featuring simple operation, high safety, excellent power, and dust collection solutions. It is developed with the aim to maximally reduce the boring cost while maintaining high performance.

Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig


Specification:
 
Model370-DTH
Working pressure (Mpa)1.05-2.46
Drilling diameter (mm)90-165
Drilling height (m)3.38
Gradeability (°)30
One time propulsion (m)3
Rotation speed (rpm)0-76
Compensation length (mm)1200
Hook height (kw)570
Machine power (kw)70 /82
Machine weight (kg)6400
Dimension (mm)3150×2170×2300
Sliding frame swing (°)Left 50/Right 35 
Drill boom swing (°)Left/Right, 45 
Drill boom pitching (°)Horizontal, 60/19
Sliding frame pitching (°)135
Rotary torque (Nm)3000
Sliding frame stroke (mm)3891
Lifting force (Kg.f)2000
Hammer type (DTH)CSJB 3.5"/4"/5"/6"
Dust removalDry/Wet, optional
Transport width (mm)2188(wet) /2300(dry)
EngineYC4D95Z-T11/4BTa3.9-C110
ManufacturerGuangxi Yuchai Machinery Group Co., Ltd./Dongfeng Cummins Engine Co., Ltd. 
Working speed (rpm)2200
Fuel tank (L)125

Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig

Application:

Metallurgical, quarry, mining, building materials, railways, hydropower construction, national defense construction and earth and stone projects, such as blasthole drilling and underwater drilling and blasting reef projects.

Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig

Package and Delivery:

We usually cover them in plastic film and ship them in full container of bulk cargo.

Related Products:

Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig


Our Factory:

Kimdrill Industrial Co. Limited focuses on Drilling Tools since 2008. Headquatered in Changsha, we have been engaged in offering full range of tools for mining exploration, water-well drilling and oil drilling.

Borehole Mining Hydraulic Hard Rock Drilling Machine DTH Drilling Rig


FAQ:

Q: What's the product range of Kimdrill?
A: Kimdrill produces full range of tools for deep foundation engineering, such as: drilling bucket, auger, kelly bar, casings tools, casing oscillators, drill bits, anchorage, strand steel, CFA, DTH and other pilling tools.

Q: What about the after sales service of Kimdrill?
A: Kimdrill offers good service in and after sales. All of our products are with warranty period.

Q: Could the visiting of factory be possible?
A: We warmly welcome customers to visit our factory anytime. Besides the visiting of factory, we also warmly welcome customers or the third parties to arrange inspection before delivery.

Q: What is the payment term?
A: We accept TT or Western Union.

Q: How about the lead time?
A: Generally, the lead time is about 7-10 working days for spare parts and 20-35 working days for machinary and big project requests. The specific lead time will be offered in every quotation sheet.