Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine

China Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine, Find details about China Freeze Dryer, Dryer Machine from Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine

Model NO.
PD-30A
Cooling Way
Air Cooling
Type
Small
Capacity(Nm3/Min)
3.8
Rated Intake Air Temperature
50 Degrees
Rated Air Inlet Pressure
0.7MPa
Pressure Dew Point
2-10 Degrees
Rated Ambient Temperature
32 Degres (2 Degres~ 45 Degres Allowed)
Pressure Loss
0.02MPa
Cooling Mode
Air Cooling
Refrigerant
R22 (R407c etc Can Be Customized)
Trademark
Lingyu
Specification
930*500*980
Origin
Zhongshan, Guangdong
Model NO.
PD-30A
Cooling Way
Air Cooling
Type
Small
Capacity(Nm3/Min)
3.8
Rated Intake Air Temperature
50 Degrees
Rated Air Inlet Pressure
0.7MPa
Pressure Dew Point
2-10 Degrees
Rated Ambient Temperature
32 Degres (2 Degres~ 45 Degres Allowed)
Pressure Loss
0.02MPa
Cooling Mode
Air Cooling
Refrigerant
R22 (R407c etc Can Be Customized)
Trademark
Lingyu
Specification
930*500*980
Origin
Zhongshan, Guangdong
Product Description
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine
Inside views
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer MachineResponsible Quality
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine
Specification
Applicative gasesCompressed air / non-corrosive air
Inlet air flowStd.3.8 Nm3 /Min |228Nm3 /Hr
Inlet air pressureStd.7 bar | Min 6 bar Max:10 bar
Inlet air temperatureStd.50 ºC | Max:80ºC
Working environment temperatureStd.32 ºC |Min 2ºC Max:45ºC
Outlet air dew point+2ºC~10ºC
Company Profile
Zhongshan Lingyu Machinery Co., Ltd. (hereinafter referred to as Lingyu), founded in 2009, is a modern new national high-tech enterprise integrating R & D, manufacturing, sales and service. Compressed air purification equipment as the core product, the company has formed five series of products and systematic solutions for different industries, scales and applications, such as petroleum, chemical industry, electric power, food, health care, biopharmaceutical, manufacturing and processing, textile industry, and is the most influential complete set of compressed air purification solution service provider in China.
With an excellent management team and a senior technical R & D team composed of refrigeration technology experts, Lingyu have tacit cooperation in product design, R & D and promotion, deeply understand the meaning of " Supported by technology, driven by value ", "Quality and service" run through every detail of the company's operation and management, and won the trust and support of customers widely. The growing process of Zhongshan Lingyu is the process of serving customers and growing up with customers. We try our best to do everything well and meet every challenge with confidence.
Exhibitions
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine
Why Choose Us
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer MachineCertifications
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer MachineFAQ

Q: Are you a factory or a trading company?
A: We are factory. And we have ourselves trading company.

Q: What is the specific address of your company?
A: No.3, 2nd Street, yuanle Road, Dongsheng Town, Zhongshan City, Guangdong Province, China

Q: Do your company accept ODM & OEM?
A: Yes, of course. We accept full ODM & OEM.

Q: What about the voltage of products? Can they be customized?
A: Yes, of course. The voltage can be customized according to your requirement.

Q: Do your company offer spare parts of the machines?
A: Yes, of course, high quality spare parts are available in our factory.

Q: What are your payment terms?
A: 50% T/T in advance, 50% T/T before delivery.

Q: What payment ways do you accept?
A: T/T, Western Union

Q: How long will you take to arrange the goods?
A: For normal voltages,we can delivery the goods within 7-15 days. For other electricity or other customized machines, we
will delivery within 25-30 days.

For more details or information, you can directly contact:
Industrial Equipment Air Cooling Refrigerated Compressed Air Dryer Machine