Overburden Casing System with Blocks Odex Concentric Casing Equipment

China Overburden Casing System with Blocks Odex Concentric Casing Equipment, Find details about China Slide Block Casing System, Concentric Casing System from Overburden Casing System with Blocks Odex Concentric Casing Equipment

Model NO.
Overburden casing system
Trademark
KIMDRILL
Transport Package
Wooden Case
Specification
118-378mm
Origin
China
HS Code
8412310090
Model NO.
Overburden casing system
Trademark
KIMDRILL
Transport Package
Wooden Case
Specification
118-378mm
Origin
China
HS Code
8412310090

Overburden casing system with blocks ODEX concentric casing equipment

Overburden Casing System with Blocks Odex Concentric Casing Equipment

Package and Delivery:
Products are always packed in wooden case. The cargo are shipped by sea or air according to the client's request. Sample order can be shipped by express such as DHL, FEDEX,UPS and so on.

Overburden Casing System with Blocks Odex Concentric Casing Equipment



Related Products:
Kimdrill also can offer Low Air Pressure DTH Hammers, Middle-Low Air Pressure DTH Hammers, High Air Pressure DTH Hammers, Big Hole High Air Pressure DTH Hammers, R.C. Hammers.

Overburden Casing System with Blocks Odex Concentric Casing Equipment

Our Factory:
Kimdrill Industrial Co. Limited focuses on Drilling Tools since 2008. Headquatered in Changsha, we have been engaged in offering full range of tools for mining exploration, water-well drilling and oil drilling.

Overburden Casing System with Blocks Odex Concentric Casing Equipment

FAQ:
Q: What about the after sales service of Kimdrill?
A: Kimdrill offers good service in and after sales. All of our products are with warranty period.

Q: Could the visiting of factory be possible?
A: We warmly welcome customers to visit our factory anytime. Besides the visiting of factory, we also warmly welcome customers or the third parties to arrange inspection before delivery.

Q: What is the payment term?
A: We accept TT or Western Union.

Q: How about the lead time?
A: Generally, the lead time is about 7-10 working days. The specific lead time will be offered in every quotation sheet.