HP200 -600 Graphite Electrode Manufacturer

China HP200-600 Graphite Electrode Manufacturer, Find details about China HP Graphite Electrode, Electrode from HP200-600 Graphite Electrode Manufacturer

Trademark
Molong
Transport Package
Packing with Wooden Case and Pallet,
Specification
HP
Origin
China
Trademark
Molong
Transport Package
Packing with Wooden Case and Pallet,
Specification
HP
Origin
China
HP200-600 Graphite Electrode Manufacturer

High Powder /HP200-600 Graphite Electrode Manufacturer

Introduction

graphite electrode is made of high-quality low ash materials, such as petroleum coke, needle coke and coal pitch.after calcining,burdening,kneading,forming,baking and pressure impregnation, graphitization and then precision machined with professional CNC machining.such of the products own characteristics with low resistivity, good electrical conductivity ,low ash, compact structure,good anti oxidation and high mechanical strength, so it is the best conductive material for electric arc furnace and smelting furnace.

HP Graphite Electrode Specification
ItemsHP
Φ200-400 Φ450-600Φ700
Resistance
μΩ.m (max)
Electrode6.57.0 
Nipple5.0 5.5
Bulk Density
g/cm3 (min)
Electrode1.621.61.62
Nipple1.731.72
Bending Strength
Mpa(min)
Electrode10.59.810
Nipple16.0 16.0 
Young's Modulus
Gpa(Max)
Electrode12.0 12.0 
Nipple16.0 16.0 
Ash  % (max)Electrode0.30.3
Nipple0.30.3
CTE
(100-600ºC)×10^-6/ºC
Electrode2.42.4
Nipple22.2


Package&Transportation
Packing with wooden case and pallet,and enlace with baling band.
HP200-600 Graphite Electrode Manufacturer
HP200-600 Graphite Electrode Manufacturer
HP200-600 Graphite Electrode Manufacturer



Application

steel making , silicon making, yellow phosphorus making

Notes of usage

1.To Place the nipples, first use compressed air to clean the hole, then carefully screwed the nipples into it (do not damage the thread).
2.To connect the electrodes, when there's 20-30mm distance between the two electrodes, using compressed air to clean the two extremes.
3.Connector locations should be selected c-map.
4.When use the wrenches to connect electrodes, should be fully tighten to specified torque.
5.To avoid electrode broken, please remove the insulating material in the furnace.
6.To avoid electrode broken, pls. place the big block in the lower and smaller block at the upper.