Brand New Full-Auto EVA Double Foaming Moulding Machine

China Brand New Full-Auto EVA Double Foaming Moulding Machine, Find details about China EVA Machine, EVA Shoes Machine from Brand New Full-Auto EVA Double Foaming Moulding Machine

Model NO.
EK82-12
Computerized
Computerized
Certification
CE, ISO9001:2008
Productivity
3850 Pairs/ 24hours
Trademark
KCLKA
Transport Package
Container
Specification
ISO, CE
Origin
Fujian, Jinjiang
HS Code
84773090
Model NO.
EK82-12
Computerized
Computerized
Certification
CE, ISO9001:2008
Productivity
3850 Pairs/ 24hours
Trademark
KCLKA
Transport Package
Container
Specification
ISO, CE
Origin
Fujian, Jinjiang
HS Code
84773090

 
The machine is computer numerical control, driven by Hydraulic Motor, full hydraulic pressure. Hydraulic system is controlled by proportional valve. The import hydraulic parts are optimized in composition, no oil leak. Practical design, large production, low energy consuming, high degree of automatization.

Technical parameter
 
ItermSectionEK81EK82
Work StationStation1212
Clamping Forcekgf2535
Mould Spacemm500*500650*500
Mould-opening Sroketmm250250
Mould Heightmm100-250100-250
Heating method Steam equipmentSteam equipment
Cooling method Cool water + Icy waterCool water + Icy water
MotorKw7.5+2.27.5+2.2
Machine Dimensionmm11500*1800*190013800*1800*1900
Machine WeightTon1823



1.it is PLC control system, with humanized parameter computer operation interface, provide all function items with clear structure, by manual and full automatic.

2.Equiped with self-research full automatic open-close mould system, no need manully open-close mould, less cost of labor and lower work intensity.

3,With cold-water cooling system, highly improve the cooling effect. 

4. Full automatic production model, heating and cooling can be finished in the same position, constrict the area of machine and make higher utilization of the factory workshop.
Brand New Full-Auto EVA Double Foaming Moulding MachineBrand New Full-Auto EVA Double Foaming Moulding MachineBrand New Full-Auto EVA Double Foaming Moulding MachineBrand New Full-Auto EVA Double Foaming Moulding Machine
FAQ:
1.What about the lead time?
Delivery 45 days after order.
2.How your quality guarantee?
We have 100% quality guarantee to customers. We will be responsible for any quality problem. 
3.Can we visit your factory before place the order?
Yes,Very welcome that must be nice to set up good relationship for business.