5L Bottle Mineral Water Filling Plant

China 5L Bottle Mineral Water Filling Plant, Find details about China 5L Filling Line, 5L Water Filling Line from 5L Bottle Mineral Water Filling Plant

Model NO.
GM-5l
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Surface Type
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Linear
Packaging
Barrel
Packaging Material
Plastic
Capacity
800bph
Trademark
GM
Transport Package
Wooden Case
Origin
China
HS Code
8422301090
Model NO.
GM-5l
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Surface Type
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Linear
Packaging
Barrel
Packaging Material
Plastic
Capacity
800bph
Trademark
GM
Transport Package
Wooden Case
Origin
China
HS Code
8422301090
5L Bottle Mineral Water Filling Plant

5L drinking water filling production line machine 

5L -800BPH Automatic washing filling capping machine
This machine with the functions of automatic washing filling capping 3-in-1 ,.it is designed by our company . With good structure and controlled by PLC with touch screen . Main material is SUS304.the machine is automatic working .
main parameters
name 5L automatic
washing filling capping 3-in-1 machine
ModelXGF-6-6-1
Capacity 600BPH based on 5L bottles
Washing heads number 6
Filling heads number 6
Screw capping heads1
Filling type Normal pressure filling for water
Power 2.1kw
Coneyor system 6meters engineering plastic
Air consumption 0.6M³/min
Water consumption :2000L/H
Weight About 500kgs
Dimension 3400*1500*2300mm
 
3. working principle
The production line start working when the bottles transported to the bottle washing machine by conveyor .at the action of cam , the bottle clips open and closed , then turn the bottles to 180°for washing . after washing the bottles back the original direction angle and open the clips . at the action of cam again , the bottles on the conveyor system. After that ,transport the bottles into the filing machine area ,there is a photo sensor on the filling machine , when the bottles transported 4pcs, the photo sensor sending data information to PLC , then PLC order the bottle blocking cylinder to sop the afterwards bottles , at the same time , another bottle blocking cylinder after filling machine working ,no letting the empty bottles go to the capping machine . at the action of program , the filling cylinders go down ,let the filling valves to into the bottles and filling , after definite time , stop filling. Then bottle blocking cylinder back ,and the full bottles go into the capping machine , the capping machine  is composed by frame ,cap manager and SS chain .there is a bevel between chain capping and level line  , when the bottles continue going towards and put on the cap ,then the capping screw the caps .
5L Bottle Mineral Water Filling Plant

 5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant5L Bottle Mineral Water Filling Plant


GM-0052