China DN500 DN800 PE HDPE Perforated Pipe for Rainwater Down Drainage System, Find details about China Poly Pipe, HDPE Hose from DN500 DN800 PE HDPE Perforated Pipe for Rainwater Down Drainage System
HDPE Pipes, Polyethylene (PE Pipe) are sorted by strength classified according to the intensity of the earlier technological developments. HDPE Pipe pressure classes that can be made between Pn4-Pn32 and the production of the desired diameter and size of HDPE pipes system has undergone many tests.One of today's most widely used pipe is HDPE pipes systems which is economical, easy in handling, efficient performance, easy method of coupling,and quite useful.
Name | HDPE Pipe |
Size | 20mm-1600mm |
Color | Black |
Connection | Welding |
Pressure | PN5,PN6,PN8,PN10,PN12.5,PN16,PN20,PN25 |
Certification | ISO14001,OHSAS18001,ISO9001,CE,GOST |
PE100 pipe for water supply | ||||||||
Nominal diameter DN(mm) | Nominal Wall Thickness(mm) | |||||||
SDR9 | SDR11 | SDR13.6 | SDR17 | SDR21 | SDR26 | SDR33 | SDR41 | |
PN2.0 | PN1.6 | PN1.25 | PN1.0 | PN0.8 | PN0.6 | PN0.5 | PN0.4 | |
16 | 2.3 | - | - | - | - | - | - | - |
20 | 2.3 | 2.3 | - | - | - | - | - | - |
25 | 3.0 | 2.3 | 2.3 | - | - | - | - | - |
32 | 3.6 | 3.0 | 2.4 | 2.3 | - | - | - | - |
40 | 4.5 | 3.7 | 3.0 | 2.4 | 2.3 | - | - | - |
50 | 5.6 | 4.6 | 3.7 | 3.0 | 2.4 | 2.3 | - | - |
63 | 7.1 | 5.8 | 4.7 | 3.8 | 3.0 | 2.5 | - | - |
75 | 8.4 | 6.8 | 5.6 | 4.5 | 3.6 | 2.9 | - | - |
90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | 3.5 | - | - |
110 | 12.3 | 10.0 | 8.1 | 6.6 | 5.3 | 4.2 | - | - |
125 | 14.0 | 11.4 | 9.2 | 7.4 | 6.0 | 4.8 | - | - |
140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 | - | - |
160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 | - | - |
180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 | - | - |
200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 | - | - |
225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 | - | - |
250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 | - | - |
280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 | - | - |
315 | 35.2 | 28.6 | 23.2 | 18.7 | 15.0 | 12.1 | 9.7 | 7.7 |
355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 | 10.9 | 8.7 |
400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 | 12.3 | 9.8 |
450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 | 13.8 | 11.0 |
500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 | 15.3 | 12.3 |
560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 | 17.2 | 13.7 |
630 | 70.3 | 57.2 | 46.3 | 37.4 | 30.0 | 24.1 | 19.3 | 15.4 |
710 | 79.3 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | 21.8 | 17.4 |
800 | 89.3 | 72.6 | 58.8 | 47.4 | 38.1 | 30.6 | 24.5 | 19.6 |
900 | - | 81.7 | 66.2 | 53.3 | 42.9 | 34.4 | 27.6 | 22.0 |
1000 | - | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | 30.6 | 24.5 |
1200 | - | - | 88.2 | 67.9 | 57.2 | 45.9 | 36.7 | 29.4 |
1400 | - | - | 102.9 | 82.4 | 66.7 | 53.5 | 42.9 | 34.3 |
1600 | - | - | 117.6 | 94.1 | 76.2 | 61.2 | 49.0 | 39.2 |
1800 | - | - | - | 105.9 | 85.7 | 69.1 | 54.5 | 43.8 |
2000 | - | - | - | 117.6 | 95.2 | 76.9 | 60.6 | 48.8 |
2250 | - | - | - | - | 107.2 | 86.0 | 70.0 | 55.0 |
2500 | - | - | - | - | 119.1 | 95.6 | 77.7 | 61.2 |
Note: C=1.25 |
1. Transport sand\mud\slurry for dredger in dredging projects or sand suction projects and also for seawater
treatment projects.
2. Transport mine tailings and slurry, metallurgical mines in the mining industry.
3. Transport pulverized coal and coal-water slurry of coal preparation plant in the coal industry.
4. Transport mud and corrosive media with slag in the chemical industry .
5. Transport powder and coal ash in thermal power plant.
6. Transport crud oil, petroleum.
1.Are you manufacturer or trade company?
We are a professional manufacture, we will provide you with top-class service.
2. What's the order process?
a.Inquiry--- The more detailed information you provide, the more accurate product we could provide you.
b. Quotation---Resonable quotation with clear specifications.
c. Sample confirmation---Sample could be sent before the final ordering.
d. T/T 30% in advanced, and the balance could be paid before shipment.
e. Production---Mass production.
f. Shipping--- By sea, air or courier. Detailed picture of package could be provided.
3. How long is your delivery time?
Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
4. How does your factory do regarding quality control?
"Quality is priority." We always attach great importance to quality controlling from the beginning to the end.
5.Can I get a discount?
A:We will be glad to give you a discount if your order is big enough.