3 Leaves 4 Leaves Plastic Air Cooler Fan Mould

China 3 Leaves 4 Leaves Plastic Air Cooler Fan Mould, Find details about China Plastic Fan Mould Making, Fan Blade Mould from 3 Leaves 4 Leaves Plastic Air Cooler Fan Mould

Model NO.
REMO-Fan 02
Runner
Hot Runner
Design Software
PRO, Ug, CAD
Installation
Semi Fixed
Standard
as Requirement
Customized
Customized
Certificate
ISO9001
Machining
CNC, EDM
Design Day
3 Days
Cavity
Single/Multi
Deliery
by Sea
Mould Material
45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Delivery Time
15-60 Days
Polish
Mirror Polish
Trademark
remo
Specification
INTERNATIONAL
Origin
China
HS Code
84807190
Model NO.
REMO-Fan 02
Runner
Hot Runner
Design Software
PRO, Ug, CAD
Installation
Semi Fixed
Standard
as Requirement
Customized
Customized
Certificate
ISO9001
Machining
CNC, EDM
Design Day
3 Days
Cavity
Single/Multi
Deliery
by Sea
Mould Material
45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Delivery Time
15-60 Days
Polish
Mirror Polish
Trademark
remo
Specification
INTERNATIONAL
Origin
China
HS Code
84807190

3 leaves 4 leaves Plastic Air cooler Fan Mould

Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc.
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA etc.

Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA etc.
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers' requirements
1. R& DWe support customer R& D. Make the files or improve the design if you need.
↓ ↓ ↓
2. Quotation MakingMould Quotation will be finished in  1   day according to the information we get.
↓ ↓ ↓
3. NegotiationThe quality, price, material, delivery time, payment item. ect.
↓ ↓ ↓
4. Mould Design3-5   days for mould and product 3D/2D drawing design.
↓ ↓ ↓
5. MouldAccording to customers' request to build the mould. Before making the mould, we send mould design to customer for approval first. Mould will be usually finished in  25-60   days.
↓ ↓ ↓
6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will   send sam ples for consumers' reference.
↓ ↓ ↓
7. SampleshootIf the first sample come out  does not satisfy customer, we modify the mould and until meet customers' satisfactory.
  ↓ ↓ ↓
8. DeliveryDeliver goods by  sea   or by  air   , according  to customers' requirement.

FOR MORE DETAILS,WELCOME TO SEND US AN INQUIRY.