China Furukawa Hb20g Hydraulic Breaker Excavator Hammer for All Series Excavator, Find details about China Hydraulic Breaker, Hydraulic Rock Breaker Hammer from Furukawa Hb20g Hydraulic Breaker Excavator Hammer for All Series Excavator
Model | Unit | HWX1400 | HWX1550 | HWX1650 | HWX1750 |
Operation weight(side/top/box) | kg | 1774/2059/1866 | 2577/2745/2968 | 2751/3156/2916 | 3905/4057/3902 |
length(side/top/box) | mm | 2480/2866/2793 | 2776/3102/3075 | 2820/3285/3337 | 3184/3812/3723 |
working flow rate | 1iter/min | 120-180 | 180-240 | 200-260 | 200-260 |
oil relief pressure | kg/cm² | 210 | 230 | 240 | 240 |
working pressure | kg/cm² | 160-185 | 170-200 | 160-180 | 180-200 |
impact rate | bpm | 350-500 | 300-450 | 250-400 | 200-350 |
chisel diameter | mm | ¢140 | ¢1550 | ¢162 | ¢1750 |
oil pipe nominal diameter | inch | 1 | 1 | 5/4 | 5/4 |
back head pressure | kg/cm² | 16±0.5 | 16±0.5 | 16±0.5 | 16±0.5 |
Accumulator pressure | kg/cm² | 60 | 60 | 60 | 60 |
Applicable Excavator weight | ton | 18-26 | 27-36 | 30-40 | 35-40 |
Applicable Bucket | m³ | 0.9-1.2 | 1.0-1.4 | 1.6-2.2 | 1.6-2.2 |
Value Ass'y Position | internal | internal | internal | internal |
Jinan Changhao Machinery Equipment Co., Ltd. located in Workshop 24, East End of Gangyuan Second Road, No. 33688, Jingshi East Road, Jinan Area of China(Shandong ) Pilot Free Trade Zone, Jinan, Shang dong, China. The workshops occupy an area of 3,000 square meters. The bonded area is supported by national preferential policies and resources are inclined. There is superior terrain, beautiful environment and convenient transportation.
Our company specialized in manufacturing all kinds of hydraulic breaker and hammer pipeline and their accessories as well as excavator attachments, breaker parts has hydraulic breaker piston, Front & Back head, cylinder, Thrust & Outer bushings, Hammer drill rod and flat pin, Valve and valve, code Seal housing and so on. All the accessories of our pipeline, including clamps, ball valve, foot valve, wire plug, wire alignment, relief valve, lock valve, bracket, connector, hammer tube, arm iron pipe assembly, three-way iron pipe, are independently developed and manufactured by our factory to ensure product quality, safety and reliability.
We have perfect production equipments and test devices. Our company has various international certifications and adopts advanced technology to ensure product quality. We strictly control the material of our products, adopting unique heat treatment technology, special alloy materials, and the quality has reached international advanced level.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 30% T/T in advance ,balance before shipment.