China Crawler Pneumatic Top Hammer Drilling Rig for Rock Blasting, Find details about China Rock Drilling Rig, Rock Blasting Machine from Crawler Pneumatic Top Hammer Drilling Rig for Rock Blasting
DRC300 crawler pneumatic top hammer drilling rig powered by air compressor, the Top hammer drilling rig is equipped with a high power pneumatic rock drifter, the heavy-duty drill arm and the main parts of this rotary drill rig are all imported from famous international brands, which guarantee the reliable quality of the drifter rock drilling rig, especially realize much less energy consumption of rolling fraction than that of sliding fraction and make the wear of sliding framework be lower.
CharacteristicsSpecification
1 | Rock Hardness | F=6-20 |
2 | Hole Diameter | 50-80mm |
3 | Hole Depth | 25m |
4 | Rod Length | 3.66 m |
5 | Rod | T38 |
6 | Rock Drifter |
|
7 | Weight Without Shank rod | 180 kg |
8 | Length Without Shank rod | 1020 mm |
9 | Cylinder Diameter | 130 mm |
10 | Main Air Hose Connection | 50 mm |
DIMENSION&WEIGHT | ||
11 | Weight | 5100 KG |
12 | Overall Length | 5900 mm |
13 | Overall Width | 2210 mm |
14 | Height | 1470 mm |
15 | Track Width | 2200 mm |
16 | Ground Clearance | 280 mm |
CRAWLER TRACTION | ||
17 | Ground Pressure | 0.45 kg/cm2 |
18 | Travelling Speed | 3 km/h |
19 | Gradeability | 35° |
20 | Oscillating Angle | 15° |
FEEDING SYSTEM | ||
21 | Max. Feed force | 30 KN |
22 | Max. Lifting force | 30 KN |
23 | Max. Feed Speed | 15 M/min |
24 | Max. Lifting Speed | 15 m/min |
Packing& Delivery
Service
In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate.
We provide "one equipment & one case, endless service, namely the after sales service begin from the order confirmation, last for the working life of the equipment.