Factory Supply Perfume Filling Machine

China Factory Supply Perfume Filling Machine, Find details about China Perfume Filling Machine, Filling Machine from Factory Supply Perfume Filling Machine

Model NO.
GH-21
Usage
Liquid
Certificate
SGS
Size of Bottle Can Be Handled
0.25-30L
Automation
Fully Automatic
Trademark
Ganghong
Transport Package
Wooden Case
Specification
12cm
Origin
China
HS Code
84223090
Model NO.
GH-21
Usage
Liquid
Certificate
SGS
Size of Bottle Can Be Handled
0.25-30L
Automation
Fully Automatic
Trademark
Ganghong
Transport Package
Wooden Case
Specification
12cm
Origin
China
HS Code
84223090

Product Introduction
This machine is a special filling machine for desktop double-headed perfume. It is suitable for the filling machine operation of glass bottled fine perfume with low capacity and high added value. The machine is novel and simple in structure, easy to clean and operate, safe and efficient. This machine is designed to reduce the flow rate of the perfume bottle. In order to increase the flow rate, the principle of vacuuming is adopted, and the liquid level positioning is adopted for measurement, ensuring no dripping, high precision, and ensuring sanitary requirements, and fully comply with GMP requirements. It is the best choice for low-yield premium perfume manufacturers.
 
Main performance parameters
1,Working principle :Vacuum pumping,Liquid level positioning
2,Number of filling heads : 2
3,Working pressure : 0.6-0.8MPa
4,Filling range : 10-500ml 
5,Working voltage : 220V 50Hz 
6,Filling accuracy :Liquid level positioning,Electrodeless adjustment
7,Dimensions : 540×360×680mm



Machine Details




Factory Supply Perfume Filling Machine

Factory Supply Perfume Filling Machine

Suitable bottles

Factory Supply Perfume Filling Machine


 
Company facilitate
Factory Supply Perfume Filling Machine

 

Packing & Delivery

Packaging Details: Standard export packing suitable for long distance land and sea transportation.

Shipping Detail: Shipped in 45 working days after advance payment and sample bottles and capers received.

Loading Port: Shanghai, Ningbo,Shenzhen


Factory Supply Perfume Filling Machine

Our Advantage:

No matter whether you're a newcomer or a sectoral expert - we have the specialists who can provide the comprehensively can-do support you need for planning a new facility in terms of not only actual beverage production, but also filling, packaging, utilities and logistics. In closely responsive consultation with you, from a multiplicity of possible options, we select the technologically and commercially most effective variant, handle the design and planning work, and bring the project to a successful conclusion at your chosen location. Sunswell is not only the consultant here, but also takes responsibility for executing the entire project.


Factory Supply Perfume Filling Machine
 

FAQ 

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

 

2) Are you factory or trading company?

We are factory and manufacture.
 

3) Where is your factory located? How can I visit your factory?

We are located in Wuxi, you can fly to Changzhou airport or Wuxi airport. We can pick you up from the airport or your hotel.

Welcome to visit us!
 

4) How to place my order?

Just contact us via Trader Manager, E-mail, Skype or telephone   to confirm the product, make the deposit then we will start to manufacture.

5) What about the transportation and delivery date?

Normally we use shipment to transport the goods.It is about 25-40 days.It also depends on which country and port you are.

It could be shorter if you need to send the goods like Asian.

If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
 

6) The After-sales Service of Ganghong Machine 

1. After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools

2.After the commissioning, we will package the equipment by standard export package for shipment.

3.According to the customer's request, we can arrange our engineers to customers' factory to do the installation and training.

4.Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the customers' project.