Dnv 2.7-1 Standard Offshore Waste Skip

China Dnv 2.7-1 Standard Offshore Waste Skip, Find details about China Offshore Container, Dnv Offshore Container from Dnv 2.7-1 Standard Offshore Waste Skip

Experice
10 Years
Producing Period
>20 Days
Frame Size
13FT
Life Span
>25 Years
Color
Customized
Trademark
Longteng Industrial
Transport Package
Non Package
Origin
Shanghai, China
Experice
10 Years
Producing Period
>20 Days
Frame Size
13FT
Life Span
>25 Years
Color
Customized
Trademark
Longteng Industrial
Transport Package
Non Package
Origin
Shanghai, China
1. DNV Offshore Waste Skip for Sale
  • Easy Handling for crane or forklift
  • Color: as per your request
  • Design Temperature:-20°C/-40°C 
  • Certificate: LR/DNV GL /BV
  • MOQ: 1 piece
  • Payload: as per your request
  • Surface Treatment: painted/galvanized
2. Offshore Mud Skip Photos 
Dnv 2.7-1 Standard Offshore Waste Skip
Dnv 2.7-1 Standard Offshore Waste Skip
Dnv 2.7-1 Standard Offshore Waste Skip



3. Boat Shaped Offshore Waste Skip Dimension 

7ft Boat Shaped Offshore Bin

Outside Dims(mm)

Outside Dims(ft)

Tare Weight(kgs)

Payload(kgs)

Max Gross Weight(kgs)

2134 x 1524 x 1524

7ft 1" x 5ft x 5ft

950

5000

5950

13ft Boat Shaped Offshore Waste Bin

Outside Dims(mm)

Outside Dims(ft)

Tare Weight(kgs)

Payload(kgs)

Max Gross Weight(kgs)

3965 x 1829 x 1524

13ft 1" x 6ft x 5ft

1400

6400

7800

 

Packing:

Non packing requirement for offshore mud skip. 
Load in 1x20GP container. 


3. Certificate
Dnv 2.7-1 Standard Offshore Waste Skip

FAQ:
 
1. Q: Can I get a dnv offshore mud skip?
   A: Sure. One sample is available. 

2. Q: Can I get offshore container with my company logo and color?
   A: Sure. Customized service is available. 

3. Q: How can you ensure your quality? Any approval?
   A: Our offshore containers have approval the ISO standard and classification society. 


4. Q: What about the payment terms?
    A: Our payment term is based on your order amount.
    Usually we accept 50%TT in advance, the balance before shipment. 

5. Q: What about delivery date?
     A: 45-90 days after drawing confirmed. 


 
Contact US
 
 
Dnv 2.7-1 Standard Offshore Waste Skip