China Mini Bus Paint Room, Find details about China Mini Bus Spray Booth, Painting Room from Mini Bus Paint Room
CPYE9275 | ||||
Outside Size(mm): | 9350x6000x4000 | |||
Inside Size(mm): | 9200x4500x3500 | |||
Front Door(mm): | 3600×3400 mm(WxH), 4-Folded with Safety Glass Window, galvanized steel cover frame,with polystyrene(EPS) insulation inside. | |||
Service Door(mm): | 650×2000 mm(W×H), With Safety Glass Window and two sets of pressure lock which will automatically open when the pressure inside is over the limit. | |||
Total Power: | 22KW | |||
Cabin System | Wallboard | Double construction with insulations EPS, thickness 75mm, 0.5mm steel thickness; width:950mm, tongue and groove interlock structure, with Polystyrene(EPS) insulation inside | ||
Basement | 2 rows air exhust plenum chamber grid, need to build the base construction , 2 rows of pits in the ground for exhaust air, with galvanized grids made by twisted steel and flat bar above | |||
Inlet Fan(Belt) | Capacity: 18000m³/h each | Outlet Fan(Belt) | Capacity: 22500m³/h | |
Power: 5.5kw | Power: 7.5kw | |||
Quantity: 2 sets | Quantity: 1 set | |||
Purification System | G3 grade, Air Inlet pre filter, EU5/F5 high efficiency filter (ceiling filter), G3 grade glass fiber floor filter, exhaust active carbon filter. | |||
Heating System | Italy Riello RG5S diesel burner, 260000Kcal/h, 1 set | |||
Heating exchanger, stainless steel | ||||
max temp: 80degree centigrade, heating time: 10-15 min(from 20 to 60)by Drying Phase | ||||
Lighting System | Ceiling Light: 12Units, each 4×36 W, with electronic ballasts; Side Light: 12Units, each 2×36W, with electronic ballasts | |||
Controlling System | Spraying, heat spraying, baking, time setting, lighting switch, failure indicator, thermostat, power supply switch, emergency stop, ampere meter, voltmeter, hour meter, temperature limit controller. | |||
Environmental System | G3 grade glass fiber floor filter, exhaust active carbon filter. |