PE Corrugated Pipe Machine (SJ65X30)
1. Suitable material: PE
2. This line consists of extruder, mould, forming machine, air/oil cooling unit, counter, coiler, which can continually extrude corrugated pipes in different sizes.
3. Moulding unit adopts excellent steel modules, through heat processing, good wearability and high reliability, which ensures the hardness and precision of the modules; Together with special gears make the modules more stable in performance.
WHY CHOOSE SUKE?
(1) We have experiences in this field since 2002
(2) We have strong technical teams and cooperate with China scientific institution to develop, improve and test our machine, to ensure what customers get are the most reliable machines from China.
(3) We select the most reliable mechanical and electrical parts for our machine with all famous reliable brands, with European CE and ISO9001 certificated.
(4) We put our heart into every business with aim of long term cooperation.
(5) We have perfect service system-- Our president is devoting himself to pre-sale, on-sale and after-sale service.
If you want more details about this pipe production line, please contact us
NoNo | Name | Model | Qty | Remark |
1.1 | Single screw extruder | SJ65×33 | 1/unit | drying feeder SJU-100kg |
1.2 | Single screw extruder | SJ30×25 | 1/unit | |
1.3 | electrical control system | | 1/set | (Siemens),(Omron),Taiwan Taita Frequency inverter ,Schneider contactor, Omron Temperature controller |
1.4 | ,Mould ,forming mould | SJMΦ20-110 | 1/set | 20,25,32,40,50,63,75,90,110 |
1.5 | Vacuum cooling box | SZDX-6000 | 1/unit | |
1.6 | Spray cooling box | SPX-6000 | 1/unit | |
1.7 | double belt Haul-off machine | SLQ-110 | 1/unit | |
1.8 | no-dust cutting machine | SJG-110 | 1/unit | |
1.9 | stacker | SFZ-6000 | 1/unit | |
TRADE TERMS- Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
- Delivery Time: 40 days after receipt of prepayment.
- Packing Method: Packing film or wooden case
- Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE- When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
- When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
- If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.