5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment

China 5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment, Find details about China Mould Rail Vehicle, Workshop Rail Vehicle from 5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment

Model NO.
BJT
Control Mode
Pendant/Remote Controller
Material
Q235B
Safety Device
Alarm Light, Buffer, Radar Detector, etc.
Warranty
12 Month
Trademark
PERFECT
Transport Package
The Whole Cart Will Be Packed by Tarp.
Specification
Customized
Origin
Xinxiang
HS Code
84289090
Model NO.
BJT
Control Mode
Pendant/Remote Controller
Material
Q235B
Safety Device
Alarm Light, Buffer, Radar Detector, etc.
Warranty
12 Month
Trademark
PERFECT
Transport Package
The Whole Cart Will Be Packed by Tarp.
Specification
Customized
Origin
Xinxiang
HS Code
84289090
5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment
 

Introduction of Material Handling Equipment
Our line of Material Handling Equipment is designed to accommodate the needs of a wide range of industries such as steel, aluminum, automotive, stamping, heavy manufacturing and several others. These units are designed to operate on floor mounted rails and are used to transport heavy materials across crane bays or in areas not serviced by an overhead crane.
5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment


Application of Material Handling Equipment
The cable reel powered Material Handling Equipment is mainly applied in assembly line (ring production line,  loop production line), metallurgy industry (steel ladle), warehouse transport, ship industry (maintenance, assemble, container transport), workpiece transport in workshop, lathe transport, steel factory (steel billet, steel plate, steel coil, steel pipe, section steel, steel structure), construction (bridge, simple building, concrete, concrete column), petroleum industry (oil pump, sucker rod and parts), energy (polycrystalline silicon, generator, windmill), chemical industry(electrolytic cell, retort etc), railway (rail maintenance, rail welding, train tractor).
5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment

Working Principle of Material Handling Equipment
This Motorized Material Handling Equipment is powered by cable. The power source 380-690v AC leaded into electrical control cabinet by cable, which controls the motor to make the cart start, stop, move forward and move backward. Hydraulic lifting system  and other accessories can be mounted on the car to meet the demand for working. The Motorized Material Handling Equipment is suitable for running distance less than 50m, high using frequency.
5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment

Parameter of Material Handling Equipment
ModelBJT-2tBJT-20tBJT-50tBJT-100tBJT-150t
Rated Load(t)22050100150
Table Size (mm)Length(L)200040005500650010000
Width(W)15002200250028003000
Height(H)50060070010001200
Wheel Base(mm)12002800420049007000
Rail Inner Gauge(mm)1200143514352002000
Wheel Diameter(mm)270350500600600
Wheel Quantity44448
Ground Clearance(mm)5050507575
Running Speed (m/min)0-250-200-200-200-18
Motor Power(kw)0.82.55.51115
Running Distance (m)2530505050
Recommended Rail ModelP15P24P43QU100QU100

Machining Of Material Handling Equipment
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.

5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment

Packaging and Shipping of Material Handling Equipment
*For length is less than 6m, the width is less than 2.2m. It will be transported by 20ft container. If the length is longer than 5.9m and less than 12m, it will be transported by 40ft container. If the quantity is 2 sets or 3 sets, they can be transported by full container. If the quantity is 1 set, it can be transported by LCL Container.
*If the length is less than 12m, the width is beyond 2.2m. It needs to be transported by flat rack (20 or 40 ft) . If the equipment is beyond above dimension, and quantity need to consider bulk cargo.

5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment


Factory and Customer
5 Ton Heavy Loads Rail Guided Vehicle Material Handling Equipment