OutlineTimber Beam H20 Column Formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.It is adjustable by changing the steel waling relative position.
Technical Specification
The steel waling of standard adjustable column formwork has three specifications. This can satisfy the need of concreting of column with side length from 200mm to 1200mm.
The length of steel waling(mm) | The side length of column(mm) |
1500 & 1800 | 800~1200 |
1500 & 1200 | 400~800 |
1200 & 900 | 200~400 |
Applications
PackageCompany ProfileForPro Formwork Technology Co.,Ltd is a professional formwork company concentrating on formwork R&D, design manufacture and selling.Our products are large size panel system, crane lift climbing formwork system, hydraulic climbing formwork system, dam formwork, single side supporting formwork, reinforcement installation platform, heavy duty load bearing tower, safety protection facilities and spare parts of various formwork systems.With more than 15 years' rich experiences in formwork industry ForPro technical team has won high reputation from our customers. Relying on profound technical accumulation and strong R&D capability, ForPro provides projects with economic and efficient formwork solution package. We can develop custom-made formwork system according to client's special requirements and we can also support our customers to renovate and upgrade their existing formwork facilities.We successively provided formwork system and technical services to Karachi Nuclear Power Plant, Hongyanhe Nuclear Power Plant, Zhejiang Daishan Island project, Ningbo Metro Line 3 and Hefei Metro Line 4 project. Sutong GIL gallery project, Jinsha river bridge, Xinpu chemical tank, Guanghui LNG tank, Chaozhou Huafeng LNG tank, Tangshan LNG, Yangshan LNG,Yanglin LNG tank, Xiapu Nuclear power plant and Fangchenggang Diesal plant project etc.Our Services1.Analysis of the initial stage, and provide professional advice, consultation and formwork planning.
2.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
3.Choose a best propasal to help our clients to bid for the project.
4.Start to devise the formwork detailedly according to the winning bidding.
5.Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.
Contact Information