Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

China Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler, Find details about China Formwork, Building Material from Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

Model NO.
Customized
Concrete Pressure
50--90kn/M2
Trademark
ForPro
Transport Package
Pallet
Specification
customized
Origin
Shanghai
HS Code
7308400000
Model NO.
Customized
Concrete Pressure
50--90kn/M2
Trademark
ForPro
Transport Package
Pallet
Specification
customized
Origin
Shanghai
HS Code
7308400000

Timber Beam Column Formwork for Concrete Column Easy to Assemble

Outline
No matter geometry, size and height, Timber beam column formwork can form any columns. With standard timber beam H20 and steel waler, the column formwork could be quickly assembled with less labour costs. With customized big size plywood, It is easy to achieve first class concrete surface. After assembling, the whole column formwork could be lift as one unit to new position. One time assembly and several reuse cycling, Timber beam column formwrok provide not only better concrete surface but also speedy construction time.The system has the same parts with wall formwork.

Main Parts

Optional any plywood sheet according to specific requirements of the projects

Universal timer beam H20

Universal steel waler

Accessories

Technical Specification 
Max. permissable pressure is 80kN/m2

Max.Cross section is 1.0mx1.0m without in-through tie rod

Flexible adjustment to fit different column dimension 

Applications

Concrete System Column Formwork with Standard Timber Beam H20 and Steel WalerConcrete System Column Formwork with Standard Timber Beam H20 and Steel Waler


Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler
Forpro Service

Provide support in every stage of projects
1. Provide cosult when client take part in projects bid invitation.
2. Provide optimized formwork tender solution to assitant client to win the project.

3. Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

4. Start to design the formwork detailedly according to the winning bidding.
5. Provide economic formwork solution package and provide continous on-site support service.