Concrete Construction Formwork, Wall Formwork for Concrete

China Concrete Construction Formwork, Wall Formwork for Concrete, Find details about China Formwork, Building Material from Concrete Construction Formwork, Wall Formwork for Concrete

Model NO.
18000000
Concrete Pressure
50--90kn/M2
Trademark
ForPro
Specification
customized
Origin
Shanghai
HS Code
7308400000
Model NO.
18000000
Concrete Pressure
50--90kn/M2
Trademark
ForPro
Specification
customized
Origin
Shanghai
HS Code
7308400000
Outline

Timber beam H20 wall formwork is mainly consisted of timber beam H20, steel waler and plywood. It can be easily satisfied to different sizes and shapes according to specific projects.  It is efficient and cost-effective and widely used in the sites all over the world.

The system is convenient for construction and easy to control the quality. It can provide an excellent concrete finish surface for any vertical structure,including walls,piers,abutments,etc.

Concrete Construction Formwork, Wall Formwork for Concrete
Concrete Construction Formwork, Wall Formwork for Concrete
 

Technical Specification  

* Basic unit sizes(width x height):  1..22m x 2.44m,1.25m x 2.5m, 1.5m x 3.0m.

* Customized unit sizes according to projects requirment.

* Up to 6.5m wall height with just one pouring

* Main components: 18mm or 21mm plywood; H20 timber beam; steel waler

Features

* Ready to use after pre-assembly

* Efficent and time-saving especially for large area walls where request for repeated castings

* Can meet different fresh concrete pressure by spacing the timbers and walings 

* Can produce fair-faced concrete finishing surface.

Applications

Concrete Construction Formwork, Wall Formwork for Concrete
      
Concrete Construction Formwork, Wall Formwork for Concrete
Company Profile

ForPro Formwork Technology Co.,Ltd is a professional formwork company concentrating on formwork R&D, design manufacture and selling.

Our products are large size panel system, crane lift climbing formwork system, hydraulic climbing formwork system, dam formwork, single side supporting formwork, reinforcement installation platform, heavy duty load bearing tower, safety protection facilities and spare parts of various formwork systems.

With more than 15 years' rich experiences in formwork industry ForPro technical team has won high reputation from our customers. Relying on profound technical accumulation and strong R&D capability, ForPro provides projects with economic and efficient formwork solution package. We can develop custom-made formwork system according to client's special requirements and we can also support our customers to renovate and upgrade their existing formwork facilities.

We successively provided formwork system and technical services to Karachi Nuclear Power Plant, Hongyanhe Nuclear Power Plant, Zhejiang Daishan Island project, Ningbo Metro Line 3 and Hefei Metro Line 4 project.  Sutong GIL gallery project, Jinsha river bridge, Xinpu chemical tank, Guanghui LNG tank, Chaozhou Huafeng LNG tank, Tangshan LNG, Yangshan LNG,Yanglin LNG tank, Xiapu Nuclear power plant and Fangchenggang Diesal plant project etc.
Concrete Construction Formwork, Wall Formwork for Concrete


Our Services

1.Analysis of the initial stage, and provide professional advice, consultation and formwork planning.

2.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

3.Choose a best propasal to help our clients to bid for the project.

4.Start to devise the formwork detailedly according to the winning bidding.

5.Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.

Contact us

Concrete Construction Formwork, Wall Formwork for Concrete