China 100mm C40 Ductile Iron Pipes Price List, Find details about China Ductile Iron Pipe Price List, 100mm Ductile Iron Pipes from 100mm C40 Ductile Iron Pipes Price List
Name | Ductile iron water supply pipe |
Material | C, Si, Mn, P, S, Mg |
Length | 6m or customized |
Color | Black |
Advantage | Anti-corrosion; Various types; Anti-infiltration; Anti-aging; Good duralbility |
Processing | pitch coated outside, Cement mortar lining |
1.Standard:ISO2531,EN545,EN598,ANSI/AWWA,C151/A21
2.Effective Length:6m/5.7m
3.Internal Lining :Ordinary Portland Cement ,Sulphate resistant cement ,High-aluminal Cement.
4.External coating:Zinc Primer Plus Bitumen or Expoxy Paiting
5. Shipment: By bulk ship or 20'/40' containr
6. Rubber: NBR, SBR, EPDM according to ISO4633/EN681.1
DN(mm) | DE(mm) | THICKNESS OF WALL(mm) | WEIGHT OF SOCKET(kg) | TOTAL WEIGHT(kg) | ||||
K8 | K9 | K10 | 3.4 | K8 | K9 | K10 | ||
80 | 98 | 6.0 | 6.0 | 6.0 | 4.3 | 77.0 | 77.0 | 77.0 |
100 | 118 | 6.0 | 6.0 | 6.0 | 5.7 | 93.7 | 95.0 | 95.0 |
125 | 144 | 6.0 | 6.0 | 6.0 | 7.1 | 119.0 | 119.0 | 121.0 |
150 | 170 | 6.0 | 6.O | 6.0 | 10.3 | 138.0 | 144.0 | 144.0 |
200 | 222 | 6.0 | 6.3 | 6.4 | 18.9 | 183.0 | 194.0 | 194.0 |
300 | 326 | 6.4 | 7.2 | 8.0 | 23.7 | 290.0 | 323.0 | 357.0 |
350 | 378 | 6.8 | 7.7 | 8.5 | 29.5 | 359.0 | 403.0 | 441.0 |
400 | 429 | 7,2 | 8.1 | 9.0 | 38.3 | 433.0 | 482.0 | 532.0 |
450 | 480 | 7.6 | 8.6 | 9.5 | 42.8 | 515.0 | 577.0 | 632.0 |
500 | 532 | 8.0 | 9.0 | 10.0 | 59.3 | 600.0 | 669.0 | 736.0 |
600 | 635 | 8.8 | 9.9 | 11.0 | 79.1 | 791.0 | 882.0 | 971.0 |
700 | 738 | 9.6 | 10.8 | 12.0 | 102.6 | 1009.0 | 1123.0 | 1237.0 |
800 | 842 | 10.4 | 11.7 | 13.0 | 129 | 1255.0 | 1394.0 | 1537.0 |
900 | 945 | 11.2 | 12.6 | 14.0 | 161.3 | 1521.0 | 1690.0 | 1863.0 |
1000 | 1048 | 12.0 | 13.5 | 15.0 | 237.7 | 1811.0 | 2017.0 | 2221.0 |
Packing and shipping
1.Export sea worthy package + water proof paper + wooden pallet
2.Max Loading 26.5mt for each 20Gp container
3.Safe loading and fixing Professional teams
4.Professional shipping line
Delivery:5-7 days after confirming the order or according to your order quantity
Port of shipment:shanghai
Remark: Insurance is all risk and accept the third party test.
Q1: Are you trading company or manufacturer ?