Item | Unit | EK3-8E2 |
Work Station | station | 8 |
Clamping Force | ton | 180 |
Mold Plate Size | mm | (290*550)*2 |
Mold Height | mm | 100-230 |
Mold-opening Stroke | mm | 350 |
Injection System | | |
Injector | | 2 |
Diameter of Screw | mm | Φ65 |
Injection Cap(Max) | cm³ | 920 |
Injection Pressure | kg/cm² | 0-130 |
Injection Speed | cm/sec | 0-10 |
Rotating Speed of Screw | r.p.m | 0-190 |
Temperature Control | section | 4 |
Electricity Consumption | | |
Heater Barrel | kw | 9.8*2 |
Heating Plate | kw | 102.4 |
Hydraulic System | kw | 51.9 |
Vacuum Pump | hp | 1.5 |
Cooling Fan of Barrel | hp | 1 |
Total Electricity | kw | 155.8 |
Oil Tank Size | L | 1000 |
Machine Weight | kg | 33000 |
Detailed Description :
Its daily productivity is 2*18*8*24=6912 pairs by theory calculation.for 1 pair in 1 mould,For 2pairs in 1 mould is 6912*2=13824 pairs per 24hours
Note:
1.Its product range includes EVA mid-soles,rainboots,slippers,sandals, clogs,sport protectors and various kinds of shoes and shoe accessories and depends on the EVA shoe mould.
2.The clamping force can be increased from 150 to 210 tons, according to your requirement.
3.The foam EVA injection molding machine is fully hydraulic and automatic operation except taking out product.
4.It is PLC controlled, its humanized parameter computer operation interface provide quick and exact terms of production.
Character:
1.Low operation height,Operation height in accord with human engineering
2.Extra height opening stroke
Act by fixed opening stroke: 350mm, which is not affected by any mould thickness changes and
3.available for 2plates mould,Mould thickness adjusting mechanism
Mould adjusting scope: 100-200MM
4.Rapid mould opening ,Act by toggle mechanism which opens the mould rapidly
5.Speedy injector movement
Driven by linear-track, allowing speedy moving and precise positioning,Energy saving design
6.No need water circulation for mould station
7.Space saving design,Put oil tank together with injection base, which makes the structure compact and saves more space.
Term:
All quotations are without value-added tax.
Delivery date:Within 60 days After receiving the 30% earnest money
Payment term: Advance payment at order 30%, 70% before shipment
Delivery State: Machines were taken apart and packed in suitable package that fits container shipping
For the machine experiment and installation, our technician will be sent to your
factory. And you are requested to afford the cost of their trip and payment .
Also Our technician will manage all the machine things for you and at the same time train your workers on how to use and maintain the machine.
Guarantee Time: One-year warranty and lifelong service. During guarantee period, the cost of any spare parts or new accessory should be borne by the seller, and the freight for delivery of spare parts will be on the buyer's account.