China Australia Hot Rolled Angle Lintel L150X100X10 T Lintel, Find details about China Galvanized T Bar, Lintel from Australia Hot Rolled Angle Lintel L150X100X10 T Lintel
Australia Hot Rolled Angle Lintel L150X100X10 T lintel
SuperM Steel Tranditional ANGLE LINTEL are hot rolled merchant bar lintels. They are traditional steel sections used in the support of brickwork over clear openings and are not reliant on composite action. specical to Australia,NZ market. more than 10 years export experiences.Got good reputation from our client and reorders.
SuperM Steel HDG Hot Rolled Traditional Angle Lintel features:
Processing & Production:
prime saw cutting the certain length as order request
punching holes at the exactly area according to drawings
Cutting Section Polishing and chamfering
surface hot dipped galvanized zinc coating Standard AS 4680:2006 (Zinc coat Min. 85um).
packing by steel strips, each bundle 1.5 tons
container loading
100 (v) x 75 mm (b) x 10 mm | 100 mm (b) x 100 mm (v) x 6 mm | 100 mm (b) x 100 mm (v) x 8 mm | 150 mm (v) x 100 mm (b) x 10 mm | 200 mm (v) x 100 mm (b) x 10 mm |
(12.58kg/m) | (9.40kg/m) | (12.03kg/m) | (18.32kg/m) | (23.00kg/m) |
900 | 900 | 900 | 1800 | 5200 |
1200 | 1200 | 1200 | 2100 | 5400 |
1500 | 1500 | 1500 | 2400 | 6000 |
1800 | 1800 | 1800 | 2700 | |
2100 | 2100 | 2100 | 3000 | |
2400 | 2400 | 2400 | 3300 | |
2700 | 2700 | 2700 | 3600 | |
3000 | 3000 | 3000 | 4000 | |
4200 | ||||
4500 | ||||
5000 | ||||
5200 | ||||
5500 | ||||
6000 |
1. QC processing:
1. Every 3 months meeting for Quality Audit to solve the weakness during processing and procedures
2. Every 6 months meeting for employee training.
3. Producing as to the International Steel Structure Standard with ISO 9001 Quality Control System
4. Each project, every 6 months, connecting with clients for feedback and complaints, then improve the quality control actions.
5. Quality inspection report for every process during production. Ensure 100% good quality products.
2. Company Certificate of us:
Qingdao SuperM Steel Company design, supply & install steel structure buildings(steel structure workshop, steel structure warehouse buildings, steel structure hangar)
More than 10-year experiences.
1. Prepare Material⇒2. CNC Flame Cutting⇒3. Assembling⇒4. Submerged arc welding⇒
5. Hand welding⇒6. Testing⇒7. Shot blasting⇒8. Painting⇒9. Packaging ⇒10. Loading container⇒11. Shipping⇒12. Customer installation
Q:Can you provide product catalog and quotation?
A: It is better if you can provide drawings(PDF or CAD),we will give you complete your drawings offer. or
We can design as the request from you, then proposal.
Q:what is you used drawing format?
A: PDF or DWG as AUTO CAD file
Q:What is the minimun order quantity?
A:No MOQ limited.
Q:What is your packing?
A:Standard export package for container transportation by sea and can be packed as customer's requested.
Q:How long is the delivery time?
A:According to project situation, usually within 30 days after receiving deposit.
Q:What is your payment?
A:T/T , 30-70 or LC at sight.
Q: Do you company offer Guide installation at project site ?
A: Yes, usually we will send you the detailed installation drawing, if you need, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas.