China Best Price Garden Metal Gate and Simple Color Main Gate Design for Villas, Find details about China Garden Metal Gate, Simple Color Main Gate Design from Best Price Garden Metal Gate and Simple Color Main Gate Design for Villas
Specification of our 6063 Aluminum main gates | |||
Product Name: | Outdoor Main Fence Gate Design Wrought Iron Aluminum Main Gate | ||
Place of Origin | Foshan,China(mainland) | ||
Model Number | SJ-M027 | ||
Material | 6063 Aluminum Alloy | ||
Finish | Powdewr Coated Painting | ||
Size | shop drawing availble according to project | ||
Appication | Garden Gate/ Main Gate/ Drive/ Way Gate/ Entrance Gate/ Courtyard Gate | ||
Usge | School/ Factory/ Garden/ Stadium Park/ Industrial zone/ Residential/villas | ||
Color | Bronze/ Black/ Gray/ Gold/ Customize | ||
Open Style | Sliding/ Swing/Folding | ||
Item: | Aluminum main gates/aluminum driveway gate /main entrance gates/Exterior main gate |
1. How about the MOQ?
1 set.
2.Are you manufacturer or trading company ?
We are the manufacturer of staircase, balustrade / railing, we also supply aluminum doors and screens for more than 10 years.
Before delivery, we will have a Installation Test of your purchased goods. We do that to make sure all we offer are in good condition, that is the perfect quality we want to control.
3. What should I provide for a courtyard gate quote?
1) Pls tell us what style or product you like.
2) Provide Some photos and plan drawings.
3) If you have any other special requirements, pls contact us.
4.How to install a courtyard gate?
will use sink head explosion bolts for the installation.and if you supply the project layout and measurements, we will offer shop drawings and provide all the items needed,so you do not need to bother to buy other extra items .and our products do not neet to welding, just use screws.
5. What is your payment?
40% as deposite,60% balance before shipment,we accept T/T,L/C,western union,paypal.
6.What is the delivery time if I make order?
Every product needs to be customized, so the normal delivery time is 30-35 days of receipt of the final payment,ortherwise about 40 days.
7. How to place order?
1) Inquiry from customer for a particular product or project.
2) Offer us your project drawing or purchasing list for our checking.
3) Our team work on the building information, and work out a solution for each product and also quotation.
4) Customer check and confirm the solution and quotation, then sign the PI and arrange deposit.
5) We offer the details shop drawing for each products and customer confirm each shop drawing.
6) Arrange production.
8. What is your advantage?
1) Most of our products are customized as your requirement.
2) Free design, we could offer you solution as your budget.
3) One stop building material, supply with main gate, stair, balustrade, shower, screene ,fence etc. to save your time, energy and cost.
4) We have rich project experience and very familiar to their building code.
5) We have our own design team to give you best design within your project budget.If required,we can also go to you rproject site for measurements and installation instructions.
We warmly welcome clients from all over the world to come to our factory for visit and cooperation.