China Automatic Conrete Mixing Plant Hzs75 with Bolted Type Cement Silo, Find details about China Used Concrete Plant, Concrete Plants 4 Silos from Automatic Conrete Mixing Plant Hzs75 with Bolted Type Cement Silo
How does the concrete batching plant work?
The concrete batching plant, known as: concrete mixing plant, is a machine that can combines various things like sand, cement, water, etc. to produce concrete.
These various ingredients are mixed in different ratios depending on the final model of the concrete which your company needs.
The batching plant is one of the most important equipments in the construction industry. It has many important components which include the cement and aggregate batchers, aggregate bins, conveyors, mixers, cement silos, control panels and dust collectors. The efficiency of the batching plant is more important to get a high quality and durable concrete.
Performance Feature:
- Flexibility in the configuration
- High production performance and high productivity
- Easy installation due to its modular structure
- Variable layout options
- Wide operating and maintenance areas
- Easy maintenance and low operating costs
1 | Theory productivity : 75m3/h | |||||||||||||||
2 | Discharge height : 3.8m | |||||||||||||||
3 | Total power : About 105kw (no including screw conveyor) | |||||||||||||||
4 | Machine weight : About 33t (no including powder silo and screw conveyor) | |||||||||||||||
5 | Area : 30m×15m | |||||||||||||||
6 | Mixing system | Mixer | Power | Feeding capacity | Discharging capacity | |||||||||||
JS1500 | 30kw*2 | 2250L | 1500L | |||||||||||||
7 | Aggregate weighing system | Aggregate bin capacity | Weighing hopper capacity | Motor power | Belt width | Measurement accuracy | ||||||||||
7m3×4 | 2250L*1 | 5.5kw | 650mm | ±2% | ||||||||||||
8 | Hoisting system | Hoisting hopper capacity | Hoisting motor power | |||||||||||||
2250L | 22kw | |||||||||||||||
9 | Cement weighing system | Weighing hopper volume | Weighing scope | Measurement accuracy | ||||||||||||
900L | 0-500 kg | ±1% | ||||||||||||||
10 | Water weighing system | Pump motor power | Weighing hopper volume | Measurement accuracy | ||||||||||||
4kw | 500L | ±1% | ||||||||||||||
11 | Liquid additive weighing system | Additive tank volume | Weighing hopper volume | pump motor power | Measurement accuracy | |||||||||||
2m3 | 40L | 0.75kw | ±1% | |||||||||||||
12 | Air circuit system | Air compressor power :11kw | ||||||||||||||
13 | Screw conveyor | Screw conveyor | Transportation capacity | power | ||||||||||||
Ф219 | 45t/h | 11kw | ||||||||||||||
14 | Powder Silo | 60t/80t/100t/150t/200t | ||||||||||||||
15 | Control room | 6m2 |
Model | Lifting Type | Theoretical productivity (m3/h) | Mixer capacity (L) | Weighing Precision | Power (kw) | |||
Aggregate | Powder | Water | Admixture | |||||
HZS25 | Bucket | 25 | 500 | ±2% | ±1% | ±1% | ±1% | 37 |
HZS35 | Bucket | 35 | 750 | 50 | ||||
HZS50 | Bucket | 50 | 1000 | 74 | ||||
HZS60 | Belt conveyor | 60 | 1000 | 75 | ||||
HZS75 | Bucket | 75 | 1500 | 105 | ||||
HZS90 | Belt conveyor | 90 | 1500 | 110 | ||||
HZS120 | Belt conveyor | 120 | 2000 | 140 | ||||
HZS150 | Belt conveyor | 150 | 2500 | 175 | ||||
HZS180 | Belt conveyor | 180 | 3000 | 205 | ||||
HZS240 | Belt conveyor | 240 | 4000 | 280 |
* Training how to instal the machine, training how to use the machine.
Q:How many countries your equipment have been export?
A:More than 40 countries and regions, for example Bangladesh, East Timor, Malaysia, Azerbaijan, Myanmar, Cambodia, Congo, Indonesia, Brazil, Ethiopia, Philippines,Saudi Arabia,Russia, Uzbekistan, Papua New Guinea,and other countries of Africa and the Middle East.
Q:How many days of the production cycle of stationary asphalt batch hot mixing plant machinery?
A: usually 15days is enough, but in the hot season or during Chinese New Year, it will be 30-40days.
Q:How many days are used for installation of one set asphalt plant?
A: About 20-30 days,according to local situation,for example,the crane, power supply, electric welding equipment and other necessary instruments, material used for installation.
Q:How many workers are needed operating the stationary asphalt batch hot mixing plant machinery?
A:1 loader operator, 1 mechanical, 1 electrician, 1 the operator of the control system and 1 manager for the whole asphalt plant.
Q:Can I visit your factory?
A:Of course. We warmly welcome you to visit our factory at any time.
Q:Which service can you provide if I buy your products?
A:One year warranty, Assist customer for worksite layout and planning, Guide customer for foundation making, Guide customer for equipment installation, Training for operator and maintenance personnel, Provide life-time service, Provide spare parts timely, Professional service engineer regular return visit.