Extruder Machine For power cable sheath Application:Apply Teflon (fluorine plastic), high temperature wire and all kinds of insulation and jacket extrusion.
Equipment feature:Screw barrel adopt high temperature corrosion of JG-113 or better performance of HC-276, heater adopt copper alloy heaters.
Taiwan plasma using pre-processor to complete all the process in one operation, which greatly increasing productivity.
Specifications Machine model | TX-25-30 | TX-35 | TX-45 | TX-50 | TX-65 |
Pay-off line type | Initiative wire pay-off | Initiative wire pay-off | Initiative single axis tension put line | Initiative single axis tension put line | Double axis put line |
Extrusions speed | 180 | 180 | 180 | 150 | 150 |
L/D of screw | 26:1 | 25:1 | 25:1 | 25:1 | 25:1 |
Screw speed | 10-90 | 10-90 | 10-90 | 10-90 | 10-70 |
Extrusions capacity | 20 | 25 | 45 | 60 | 100 |
Diameter range | ¢0.2-¢2.0 | ¢0.4-¢3.0 | ¢0.6-¢8.0 | ¢0.6-¢8.0 | ¢1.0-¢10 |
Main unit power | 7.5kw | 11kw | 15kw | 18.5kw | 30kw |
Tows power | 2.2kw | 2.2kw | 2.2kw | 2.2kw | 4.0kw |
Take-up power | 1.5kw | 1.5kw | 1.5kw | 1.5kw | 2.2kw |
Taking-up device | Double axis/axis | Double axis/axis | Double axis/axis | Double axis/axis | Double axis/axis |
Electronic control | Controlled inverter +PLC entire journey control |
The above dates are for reference only, welcome email (telephone) to consult with, come instruction, and talk over business!
Why us?We are the cable equipment manufacturer
Professional engineer, long term to research and development for to cable equipment .
High frequency capacity manufacturer machine is provide .Guarantee the machine all weather running.
Our machine use the international qualified brand, like Siemens ,Omron,NSK,LG etc.
Install and training service. Guarantee overseas install and cable manufacture training experience.
Technical support and spare parts service.
We DO not only provide the high quality machinery products, but also design the full set of equipment for you.
PAYMENT:1. T/T or L/C (advise)
2. Wooden packing or PE film sample packing ( Customer requirements )
3. We 'll do house inspection for every machine before loading it, and also inspected by buyer in person.
HOW TO REACH OUR FACTORY:
1.Only 35 minutes from Guangzhou city to Dongguan city by high speed train.
2.Just 40 minutes from Shenzhen city to Dongguan city by high speed train.
3.Total 1.5 hours by car from Guangzhou airport to our factory .
4.Only 0.5 hour by car from Shenzhen airport to our factory.
Contact Person:
Miss Jennie:+86-17322120503