China Large Spindle Through Hole Geotechnical Engineering Drilling Rig (GY-200-1D), Find details about China Geotechnical Investigation Drilling Rig, Spt Drilling Equipments from Large Spindle Through Hole Geotechnical Engineering Drilling Rig (GY-200-1D)
1. Drilling Capability | ||||||||||
Spindle Turnable Angle | 0°~360° | |||||||||
| Wire-line Core Drill Rods | BQ | 245m | |||||||
NQ | 200m | |||||||||
HQ | 160m | |||||||||
2. Rotary Table | ||||||||||
Speed(r/min) | Forward | 900 475 388 205 157 68 | ||||||||
Reverse | 256 85 | |||||||||
Max Torque | 2000N@m | |||||||||
Feeding Travel | 400mm | |||||||||
Max Feeding Force | 29KN | |||||||||
Max Lifting Force | 39KN | |||||||||
3. Hoist | ||||||||||
Bobbin Dia | φ135mm | |||||||||
Rope Dia | φ12.5mm | |||||||||
Bobbin Capacity | 30m | |||||||||
Single Rope Hoisting Capacity | 30KN | |||||||||
Single Rope Max Hoisting Speed(2nd Layer) (m/s) | 0.27 0.64 0.83 1.58 1.64 | |||||||||
4. Oil Pump | ||||||||||
Model | CBF-F420-ALPLCBF-F420-ALPL Gear Pump | |||||||||
Displacement | 20mL/r | |||||||||
Rated Speed | 2500r/min | |||||||||
Rated Pressure | 20MPa | |||||||||
Max Pressure | 25MPa | |||||||||
5. Engine | Model | Power | Speed | Weight | ||||||
(1) Electro-motor | Y160L-4 | 15KW | 1460r/min | 144kg | ||||||
(2) Diesel Engine | CHANGCHAI ZS1110 | 14.7KW | 2200r/min | 180kg | ||||||
6. Frame | ||||||||||
Type: Sliding(with sliding frame base) | ||||||||||
Rig Travel | 400mm | |||||||||
Distance Away from Hole | 270mm | |||||||||
7. Dimension(L*W*H) | 1820×980×1650mm | |||||||||
Rig Weight(without engine) | 750kg |