China Weatherability Curved Roof Prefabricated Steel Structure Warehouse Godown, Find details about China Steel Structural Warehouse, Pre Engineered Building from Weatherability Curved Roof Prefabricated Steel Structure Warehouse Godown
Reasonable Price Well Designed Light Gauge Steel Structure Godown
Steel structure is widely used in factory, warehouse, High Rise Offices, Shopping malls, Community buildings, Stadium, Football field, etc. Base material of steel structure is good quality Q235/Q345 steel. Earthquake resistant ability can endure at least 8 Degree earthquake,Climate conditions -20°C-45°C,Snow load100 Kg/m²,Wind speed150 Km/h.
No. | Item | Materials |
1 | Column and Beam | Q345 or Q235 H section steel ( painted or galvanized) |
2 | Wall&Roof Purlin | C or Z section steel, size from c120~C320, z100~Z200(galvanized) |
3 | Wall&Roof Panel | Colorful corrugated steel sheet or sandwich panels (eps, rockwool, fiber glass, pu etc.) |
4 | supporting | steel angle, steel pipe, steel round bar. |
5 | door | sliding sandwich panel door or rolling up door |
6 | window | pvc or aluminum alloy windows |
7 | accessory | anchor bolt, high strengthen bolt, normal Bolt, skylight Belts, ventilators, gutter, down pipe, etc. |
Main Frame + Support System + Roof and Wall Panel System=steel frame construction
Main Frame of steel frame construction is made by H-section and box girder.
1.Wide flanges make H-beam have a higher lateral stiffness fit for compression member.
2.Flanges of H-section with same thickness parallel with one another have strong resistance to bending, easy to composite and joint with other component for your steel frame construction south africa.
Support System of steel frame construction
1. Support system of steel frame construction south africa mainly consist of purlin, cross bracing and angle brace made by Z-section, C-section or angle, allot the payload of column and pillar, transfer the loading to whole frame.
2. Support system makes the steel frame construction south africa frame structure stand as a unity; improve the solidity and stabilization of frame itself.
Roof and wall panel system of steel frame construction
1. Roof and wall panel system of steel frame construction south africa mainly made of color steel or color steel sandwich panel.
2. Roof and wall panel system connected by self-tapping screw, easy and fast to assemble steel frame construction south africa.
3. Good mechanical property as well as bearing capacity of steel frame construction south africa.
4. Multiple color and surface finishing available meet your customization requirement and preference for steel frame construction south africa.
Please Kindly provide the following importance technical parameter for quotation:
(1) Building size: length * width *height ;
(2) Wind speed (max speed);
(3) Snow load (kg/m2 in max situation);
(4) Earth quake grade (if have) ;
(5) Live load and dead load for roof and flooring(special for mutli-floors building);
(6) The requirements for window and door;
(7) Max height and weight for crane to lift.
FAQ:
1. Common type of the industrial steel structure building/Prefabricated house?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2. What's the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3. How about the delivery time?
Reply: Usually,within 20-25 days after the order confirmed, also depends on the order quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure or by Galvanized frame;
manual derust St2.0 on secondary steel structure.
5. What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU sandwich panels.
6. How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no workteams , we can send our professtional teams to install for you.
7. Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.
8. Prefabricated warehosue/workshop/Prefab house/Storage Life :
Reply: All steel structure frame life is more than 50 Years , all caldding sheets are about 20 Years.